PLAN CHECK NO:
101111973
PROJECT ADDRESS:
927 W Alton Ave
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
9/12/2022
INITIAL REVIEW
10/18/2022
EXPIRATION
3/11/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Eduardo Suarez
3.
TEL:
(949)929-8020
FAX:
VALUATION: $10,000.00
EMAIL:
edusuarez666@hotmail.com
FLOOD ZONE: X-0602320259J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
Sheet A-1:
Wall between garage and new addition - Please specify/provide minimum ½” gypsum board on the garage side of wall.
Specify door size for office door.
Please clarify if new fireplace is provided on the new office side. Wood-burning fireplace is not allow for new fireplace. Specify on plan, manufacturer’s name and ICC/UL listing number for the gas fireplace, if new fireplace is provided.
Specify roofing material for the new addition.
Sheet S-0:
Roof plan – please revise plan to show cricket divert water toward the edge of the roof.
Section B: Please revise building section to show finish slab of new addition higher than the existing garage slab.
Please provide information for the section notes called out on the building sections.
Sheet S-1:
Roof framing plan: Please show/provide strap between existing wall and new wall (at line 1 & at line A), at top plates.
Detail 8: please revise detail to provide minimum 5 -16d nails for ceiling to rafter lap connection.
Detail 11: Please specify 2x12 ridge board.
Detail 5/S-1 called out for wall between new addition and existing garage was not applicable. Please revise provide detail to show existing garage footing with stem wall and garage slab located lower than the new slab.
(End of comment)