Loading...
HomeMy WebLinkAbout293758_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102112333 PROJECT ADDRESS: 2025 S Cypress Ave PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/11/2022 INITIAL REVIEW 11/9/2022 EXPIRATION 4/9/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Daniel Talman 3. TEL: (760)518-8002 FAX: VALUATION: $35,000.00 EMAIL: dan@ggrihomes.com FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Sheet S-0On the site plan, relabel building #2 as existing garage.On the site plan, identify the rectangular shape between the garage and the primary residence.On the site plan, cross-reference the primary residence to the foundation plan on sheet S-1.Under General Requirement #1, in addition to the ‘2019 California Building Code’ reference, include ‘2019 California Residential Code’ as applicable code.=Sheet S-1Show location of the foundation vents on the foundation plan or elevation drawings. Ventilation size and location shall meet section R408.1. Specify the material of the ventilation vents which meets one of the listed material in section R408.2.Show location of the under-floor access location and size, which meets the requirements of section R408.2.Show location and length of the shear walls.Identify all hold-down locations and cross-reference the structural detail.Additional Comments on Structural SafetyThe Engineer On Record shall address the following questions and comments:How is the danger of building collapse being addressed?Detail A on sheet S-1 shows a minimum 18-inch under-floor space and a minimum 18-inch deep footing. Due to a limited space between the raised floor and the grade, what is the maximum excavation depth to accommodate workers and foundation formwork underneath the floor?Provide means and method to support the building and excavation.How can workers avoid hitting underground utility lines and pipes during excavation work?What types of protective systems are used to protect workers from cave-ins or building collapse?What are the requirements for safely installing and removing protective systems?What means of access and egress are provided?Where is the excavation access location, width, and depth?Note on plan: “The Engineer On Record shall certify the safety conditions before commence of construction.”[End of Comments]