Loading...
HomeMy WebLinkAbout293721_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112316 PROJECT ADDRESS: 2226 E Santa Clara Ave PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/11/2022 INITIAL REVIEW 11/1/2022 EXPIRATION 4/9/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Doug McBeth 3. TEL: (949)374-0166 FAX: VALUATION: $30,000.00 EMAIL: dmcbethdrafting@gmail.com FLOOD ZONE: X-0602320164J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work.Provide continuous Second Floor plywood diaphragm to exterior shear walls of First Floor, when Second Floor exterior shear walls are recessed. Clearly show on the plans how second floor lateral loads are transferred to first floor shear walls.Design diaphragm to transfer shear from 2nd floor wall to the first floor. Detail the shear transfer connections which transfer lateral forces from horizontal diaphragms through intermediate elements and shear walls to the foundation. (1603) For plywood roof and floor diaphragm specify thickness, grade, T&G edges, panel span rating, nailing schedule and required blocking and panel layout pattern. Specify on the framing plans the shear wall material, thickness, size and spacing of fasteners andsole plate nailing. Call out anchor bolt spacing and hold down hardware on foundation plan.