HomeMy WebLinkAbout293798_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101112345
PROJECT ADDRESS:
3900 W Segerstrom Ave
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B, S-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/12/2022
INITIAL REVIEW
10/23/2022
EXPIRATION
4/10/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Budi Prasetyo
3.
TEL:
(800)901-4822
FAX:
VALUATION: $275,000.00
EMAIL:
bprasetyo@clrefrigeration
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)Please provide a site plan showing property lines, streets, north arrow, all buildings located on the same lot, location of building where roof top units are proposed. Plan must be legible. Reminder: aerial map is not acceptable. Please provide the following information on the cover sheetApplicable Codes (2019 CBC, CPC, CMC, CEC, California Energy Code, California Green Building Code)Type of Construction and Occupancy groups Scope of work – specify number of replaced roof top units (RTU) and new RTU.(End of Comment)