Loading...
HomeMy WebLinkAbout293095_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112118 PROJECT ADDRESS: 4012 W Garry Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/23/2022 INITIAL REVIEW 10/2/2022 EXPIRATION 3/22/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Brad Kenson 3. TEL: (949)228-5687 FAX: VALUATION: $50,000.00 EMAIL: brad@rootsproperties.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) Sheet ST1.0: Provide Sheet IndexOn the plan, please provide scope of work (T.I of existing building consist of remove/demo existing interior partition walls; combine multiple small storage/warehouse spaces into one large warehouse space. Existing office areas to remain…). On the plan, please specify Applicable Codes (2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code, California Green Building Code, California Energy Code. On the plan, please provide building data:Building area per occupancy groupNumber of storyType of constructionOccupancy groupsSprinkler (Yes or No?)Sheet A1.0: On the plan, please show/provide accessible restrooms. Restrooms shall be made accessible to the persons with disabilities. Provide restroom plans and details to show compliance with Chapter 11B, Division 6. Floor plan: Please show dimensions. Office area – Please label the use of each room. Provide an egress plan showing occupant load and exit doors. **This is not a demo permit. It’s a tenant improvement permit. Additional plan check fees is required.