HomeMy WebLinkAbout293798_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112345 PROJECT ADDRESS: 3900 W Segerstrom Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/12/2022 INITIAL REVIEW 10/23/2022 EXPIRATION 4/10/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Budi Prasetyo 3. TEL: (800)901-4822 FAX: VALUATION: $275,000.00 EMAIL: bprasetyo@clrefrigeration FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Please provide a site plan showing property lines, streets, north arrow, all buildings located on the same lot, location of building where roof top units are proposed. Plan must be legible. Reminder: aerial map is not acceptable. Please provide the following information on the cover sheetApplicable Codes (2019 CBC, CPC, CMC, CEC, California Energy Code, California Green Building Code)Type of Construction and Occupancy groups Scope of work – specify number of replaced roof top units (RTU) and new RTU.(End of Comment)