Loading...
HomeMy WebLinkAbout285816_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101109888 PROJECT ADDRESS: 1044 E Fourth St PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/24/2022 INITIAL REVIEW 5/26/2022 EXPIRATION 9/20/2022 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Brandan Leach 3. TEL: (951)801-8011 FAX: VALUATION: $150,000.00 EMAIL: b.leach@wcleinc.com FLOOD ZONE: X-0602320276J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Sheet S-1The Generator Pad Note #1 indicates the concrete pad location and size are identified in the electrical plans. In city of Santa Ana, the electrical permits are issued as a separate permit. Please include the site plan and identify the concrete pad location.Planning division requires screening for the generator. Provide details of the screen or fence. Show location of the screen on the site plan.Provide the following note on the plan:” The concrete testing lab shall provide a concrete compressive strength design report that meets the concrete compressive strength of 4,000 psi. The Engineer On Record shall review and approve the report and provide the report to the deputy inspector prior to the final building inspection.[END]