Loading...
HomeMy WebLinkAbout295274_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112818 PROJECT ADDRESS: 214 S Birch St PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/21/2022 INITIAL REVIEW 12/6/2022 EXPIRATION 5/20/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jamie Dalinghaus 3. TEL: (951)473-0577 FAX: VALUATION: EMAIL: Jamie@dalinghausconstruction.com FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. 5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DrawingsSheet 2Revise sheet number in detail references to refer to new sheet.Please note if beams are new or existing where beams are shown on plans (e.g. at #8-11 and 12-18) for clarity.Verify if new foundation occurs at supports #1, 3, and 5. Provide detail for new foundation interaction with existing foundation. Provide detail for proposed new Carbon Fiber Wrap specifying location at stem wall. Verify note on plan “REPLACE SECTION OF FTG @ PIER #4”. No new foundation extent is shown on plan, please provide.Provide end connection detail for new 4x6 girder beam atop #19 and 20.Verify if new 4x6 girder is supporting existing floor joist, provide detail showing connection of existing floor joist to new girder.New 2’x2’x2’ concrete pad in enlarged repair plan does not match foundation thickness found in C/2.5. Please revise as needed. Sheet 2.5Verify ICC 3815 specified in Re:grid documents provided and ensure product is ICC tested and approved for concrete conditions. ICC found shows only Masonry condition use.Detail B – Provide new Simpson anchor size, embed, and ICC #.Detail B – Verify if foundation under PPB-107 is new or existing.Detail D – Provide vertical rebar size and spacing.Detail D – Verify footing dimensions with plans, new continuous foundation on plans are scaled larger than 18”.(End of Comment)