Loading...
HomeMy WebLinkAbout294706_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112635 PROJECT ADDRESS: 1030 S Karen Ave Unit# 2 PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/4/2022 INITIAL REVIEW 12/5/2022 EXPIRATION 5/3/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Brandon Pham 3. TEL: (714)209-6617 FAX: VALUATION: $95,000.00 EMAIL: br6789@yahoo.com FLOOD ZONE: X-0602320256J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. 5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DrawingsSheet A-1Add note on the coversheet: Photovoltaic system will be submitted under a separate permit and shall be issued prior to building frame inspection request.Add provided signed Grading Exemption Checklist into drawing set on same sheet size as drawing set. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.Sheet A-3.1Underside of eave projecting within 5’-0” from property line shall be 1-hour fire rated or an equivalent fire rated system must be provided per 2019 CRC. Please show on plan where required and provide detail for proposed fire rated system. Note alone does not suffice. Sheet S-0Foundation Note 1 – Soils report has been provided for this project, please add soils engineer/report info including company, report #, report date, and any addendums. Revise soil variables as needed to match report.Sheet S-1Provide dimension for interior foundation lengths.New foundation depths shall be 24” minimum per soils report recommendations. Pad #1 reinforcing does not match calculations, please coordinate and revise to match. Sheet S-2Verify on plans which walls are intended to extend to roof, dimension with note not clear.Provide detail 22/D-2 referenced on plans.Verify new 4x4 KP located at Bedroom #2. KP does not look to be supporting any framing. Sheet D-2Detail 1 – Wall insulation provided in detail does not match T24. Please revise as needed, typical all details where insulation is provided.Detail 4 – Interior non-bearing walls shall be slip connected with a gap or equivalent to allow for non-bearing action. (End of Comment)