HomeMy WebLinkAbout293927_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112376, 101112375,101112377 PROJECT ADDRESS: 1524 BrookhollowDr Unit# B PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/20/2022 INITIAL REVIEW 10/29/2022 EXPIRATION 4/18/2023 RECHECKS: 1. 12/17/22 PROJECT APPLICANT CONTACT PERSON: 2. Shirin Zarkesh 3. TEL: (714)662-2283 FAX: VALUATION: $120,000.00 EMAIL: shirin@ayzarinc.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Ok 12/17/22Drawings must be to scale and be on 18” x 24” minimum sheets. Ok 12/17/22 - Scale of Drawings must be large enough to ensure legibility - Scale provided doesn’t match the dimensions. - Provide a fully dimensioned Floor Plan Provide the following: 12/17/22 - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan. - Show all property lines of record on the site plan. Show compliance with CBC Section 704 and CBC Tables 601, 602, and 704.8.Identify all the units on the site plan. Ok 12/17/22Enlarge site plan and path of travel to all units, show path of travel complies with accessibility.ok 12/17/22Show on the plans: ok 12/17/22 - Area tabulation justifying floor area(s) of building(s) (CBC Sections 503, 505, 506, 507, and 508 and CBC Table 503) - Number, width, and purpose (cite code section) of yards required - Number of stories/mezzanines and building height in feetPlease revisit the dimensions and verify the dimensions are matching provided scale. ok 12/17/22Dimension for the additions on the North side do not match the scale. Please provide 1 /4” scale. ok 12/17/22 Call out new exterior door for unit B in the back. Ok 12/17/22 What is overhead beam D009 on sheet A-0.4., is it structural member. Ok 12/17/22Label and note hourly fire rating of: 12/17/22 - All corridors - Stair enclosuresProvide complete floor plan for unit A and C. 12/1722 Indicate detail and section references as to their appropriate location on the plan view. 12/17/22 Provide I-hr, exit enclosure for the new addition at unit C. 12/17/22 Provide the same fire rating for the new addition #224 as the stairway enclosure. 12/17/22Provide complete detail for all interior and exterior walls. 12/17/22 Provide complete detail for wall and door # 104 on sheet A1.1. 12/17/22 Provide typical section view detail of all new partitions and ceilings showing: 12/17/22 - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above.Complete all soffit and furred out wall details. Provide complete detailing, including number, type, location of fasteners and how attachment is made to the building structure. Show compliance with CBC Section 803.(cross reference all the details on the plan view) pending 12/17/22Provide complying exiting plan for all 3 units. 12/17/22EXIT ACCESS. That portion of a means of egress system that leads from any occupied portion of a building or structure to an exit. CBC Sections 1016..ok 12/17/22Table 1006.3.3(2) For Buildings With One Exit: (For Unit C)Pending12/17/22 total common path of travel for unit A is 103 feet.Maximum HeightMaximum OccupantsOf Building(Or Dwelling Units)OccupancyAbove Grade PlanePer Floor And Travel Distance A, B, E, F, M, U1 Story49 occupants and 75’ travel distanceNote on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.” ok 12/17/22All doors require a level floor landing on each side in accordance with CBC Sections 1010.1.5. Provide typical door threshold details and details of change in floor covering material. Ok 12/17/22 Provide minimum 48” clear landing at door # 109 and 110. Ok 12/17/22 Provide minimum 12” clearance to the strike edge of door 100b. ok 12/17/22 Provide landing and threshold for all new exterior doors on sheet A1.1. ok 12/17/22 Provide landing with detail for new back door # 100a. ok 12/17/22 Provide dimension at the opening in the reception lounge. Ok 12/17/22 Provide maximum 34“ height for the counters and sink in the breakroom. Also provide required knee clearance. Pending 12/17/22CBC Section 11B404.2.7.Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.Ok 12/17/22CBC Section 11B404.2.9.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.Ok 12/17/22 All building entrances that are accessible to and usable by persons with disabilities shall be identified with a least one standard sign and with an additional directional signs, as required, to be visible to persons along approaching pedestrian ways.Pending 12/17/22 Show location on the floor planCBC Section 11B-504, The upper approach and the lower tread of each interior stair shall be marked by a strip of clearly contrasting color at least 2” wide placed parallel to and close to (not more than 1” from) the nose of the step or landing to alert the visually impaired. The strip shall be of material that is at least as slip-resistant as the other treads of the stairs.Pending 12/17/22 Show on the floor planExit illumination and exit sign requirements in accordance with CBC Section 1013shall be shown on the drawings. Be specific as to the type of exit signs to be installed.Pending 12/17/22 Please see red mark for unit A. CBC Section 1013.1. Provide a directional exit sign at changes in exiting directionTactile exit signs shall be required at the following locations:. Pending 12/17/22 Provide for room 204. - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be identified by a tactile exit sign with the following words as appropriate:“EXIT STAIR DOWN”“EXIT STAIR UP” - Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”Sheet A4.1, show minimum 19” Clearance to the outlet of the toilet paper dispenser. Ok 12/17/22Provide 7”-9” clearance to the center of toilet dispenser. Ok 12/17/22 Provide dimension for all bathrooms in unit A and unit C , and show comply with accessibility.Pending 12/17/22 provide minimum 60” clearance from the toilet wall to the sink.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4 - An accessible entrance - An accessible route to the altered areaPending 12/17/22 - Accessible restrooms 12/17/22 - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsIf a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 11B-247.1.2.5Ok 12/17/22Each lot or parking structure where parking is provided for the public as clients, guest or employees, shall provide accessible parking as required by CBC Section 11B-502. ( Provide dimension)ok 12/17/22CBC Section 11B-208.2.4 One in every six accessible spaces, but not less than one, shall be served by an access aisle 8’-0” (96”) wide minimum and shall be designated van accessible as required by Section 11B-502. The words NO PARKING shall be painted on the ground within each eight’ loading and unloading access aisle. This notice shall be painted in white letters no less than 12” high and located so that it is visible to traffic enforcement officialspending 12/17/22 show the signageCBC Section 1607.7. Provide complete grab bar details on the drawings showing compliance with CBC Section 1115B.8 including structural strength to support a 250 pound point load. Ok 12/17/22CBC Section 11B-606.5 Item 4. Note on the drawings hot water and drain pipes under lavatory shall be insulated. Ok 12/17/22Baby changing tables when deployed shall not obstruct the required width of an accessible route except as allowed by Section 11B-307.2. Baby changing table complying with Section 11B-604.8 within a multiple accommodation toilet facility. Ok 12/17/22Complete the attached Disabled Accessibility Documentation Form. Ok 12/17/22 New window #B on sheet A1.1, shows 5’-11” but existing opening on sheet A.04 is 4’, please clarify the dimensions. Ok 12/17/22Provide on the drawings a complete window schedule showing: ok 12/17/22 - Window sizes - Type and thickness of glazing (type of safety glazing for hazardous locations noted under CBC Section 2406.3Provide thickness of glazing for glass doors. Ok 12/17/22 Provide detail for glass wall for offices 106 and 110, show how they are supported laterally and vertically. Ok 12/17/22This building is subject to the State of California Energy Conservation Regulations:Pending 12/ 17/22 Provide insulation for all the new additions. - The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations (CCR,) Title 24, Par 6, 2019California Energy Code. The plan check consultant must sign documentation certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency. - The corrected/final ARCHITECTURAL drawings shall have the required energy efficiency compliance documentation with completed signature blocks filed on the plans. The same information may be copied on the Electrical Plans for the Electrical Plan Checker.Provide calculation and complete construction detail for drywall ceiling.Pending12/17/22 provide for the bathrooms and sleeping podProvide detail to show how T-bar ceilings are attached to the structure above.Pending 12/17/22 not foundProvide detail for I-hr fire rated wall per gypsum board association manual or chapter 7. Pending 12/17/22 , CBC 2013 is out dated , provide complete detail for the reference number per CBC 2019. Provide same dimension and scale for structural plan and architectural plan to match.Pending 12/17/22 not found , Show dimensions on the structural plan.Show exact location of detail 4/A2.1 and 5/ A2.1. ok 12/17/22For the opening between 2 bathrooms in unit B, provide calculation if the demo wall is a bearing wall.Pending 12/17/22( Any Beam)Provide anchor bolt spacing for shear wall SW1 on sheet S2.1.ok 12/17/22 Provide construction detail for new addition on the North side. ok12/17/22 On detail 1/S-4 , show nailing size and spacing.ok12/17/22 Provide detail for out of plane loading for all new addition.Pending 12/17/22 provide for East side addition Provide footing at all new exterior walls.Pending 12/17/22 provide for East side addition Provide dimension for roof framing to match structural calculation.Pending 12/17/22 , not foundPlease provide weight of the existing RTUs. Ok 12/17/22For replacement of existing RTUs, provide calculation to show existing members will carry load from new RTUs. Pending 12/17/22, Engineer of record please show all the response on the response letter on the structural plan.12/17/22Detail S1.4, please identify nailing for 2 sided LVL attachment, seems like too many nailing , wood will split.Sheet AS1.4, referenced on sheet A-0.1.1 is not included. Show door #104 is tempered. Provide elevation for door #104, and show how it is supported laterally and vertically.For t- bar ceiling, provide attachment detail to the structure above. Provide detail for handrail size, height and gripping surface and clearance to the wall per 11B-505.5. Show height of the handrail for the ramp and stairways is 34” -38” high. 11B-505, Ramp handrail shall extend horizontally above the top and bottom landing for 12”, cannot bend. Show bottom extension of the stair handrails comply with 11B-505.10.3. Show dimension of the ramp including the length of the ramp. Show size of the top and the bottom landing of the ramp. Top landing shall be minimum 60” wide and 60” long, bottom landing shall be flat and minimum 72” long. Show slope and cross slope for the landings. On Sheet A-0.4, please identify which unit uses the bathrooms , the bathrooms walls are altered. And provide door to these bathrooms. Detail 7/A6.1, provide size and spacing for the fasteners. On sheet S2.2, provide 6x posts for 2x6 studs per detail 5/S1.3.Cross-reference all the details on the plan view. Please revise scope of the work to match the construction work.