Loading...
HomeMy WebLinkAbout288366_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101110676 PROJECT ADDRESS: 3 E MacArthur Pl PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/6/2022 INITIAL REVIEW 7/15/2022 EXPIRATION 12/3/2022 RECHECKS: 11/7/22 PROJECT APPLICANT CONTACT PERSON: 2. Nicolas Daguer 3. TEL: (714)394-5735 FAX: VALUATION: $8,630.00 EMAIL: nicolas@sky-rider.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Please provide structural calculation from structural engineer of record (KPFF Consulting Engineers) for the existing building frames to support the loads imposed by the proposed maintenance equipment. 2nd Review Comment: Structural plans by kpff – Please provide plans with the same paper sizes and must be legible, and incorporate structural plans into the submittal plan sets. Final plans shall be stamped by both engineers, the Skyrider’s engineer and the structural engineer of record (KPFF). 2nd Review Comment: In addition to the letter provided by the kpff, please provide “reviewed” stamp on the plans. (End of Comment)