Loading...
HomeMy WebLinkAbout294512_4_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112563 PROJECT ADDRESS: 410 N Fairview St PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/1/2022 INITIAL REVIEW 11/5/2022 EXPIRATION 4/30/2023 RECHECKS: 1.11/26/2022 PROJECT APPLICANT CONTACT PERSON: 2.12/04/2022 Mike Easton 3. TEL: (949)223-5090 FAX: VALUATION:$225,000.00 EMAIL: measton@eastonpacific.com FLOOD ZONE: APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)PLAN CHECK COMMENTS:Update plan 1/A1.1 to show minimum 48” (not 36”) clear width of ramps and exterior routes.Sheet RTW. Foundation plan and section A are inconsistent with architectural plans. E.g. see plan 1/A1.1. The location of the footing is not consistent. Missing new footing design on the latch side of the new pedestrian gate. Provide design and details for the new gate footing at the vehicular gate, pedestrian gate and new fence wall. Coordinate with architectural drawings.END OF COMMENTS