HomeMy WebLinkAbout293628_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101112299-101112302
PROJECT ADDRESS:
1136 and 1146 E Washington Ave
PLAN CHECK ENGINEER:
Lee, Wayne / Gary HuangTEL:714
647-5848
647-5862
EMAIL:
wlee@santa-ana.org
ghuang@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V A, V B SPK
OCCUPANCY CLASSIFICATION(S):
A-3, B, R-2, M, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/31/2022
INITIAL REVIEW
11/7/2022
EXPIRATION
4/29/2023
RECHECKS:
1.12/19/2022
PROJECT APPLICANT CONTACT PERSON:
2.
Cheron Weimholt
3.
TEL:
(949)250-0607
FAX:
VALUATION:
EMAIL:
cheronw@whainc.com
FLOOD ZONE: X-0602320163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.Refer to this letter and redlines on the drawing for the corrections. Please pick up submitted plan.All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
ARCHITECTURAL
No comments.
STRUCTURALSTRUCTURAL PLAN REVIEW COMMENTS: BY GARRY WANGPhone number: 714-647-5862Email:ghuang@santa-ana.org
Sheet S1.11
Provide structural calculation for the revised shear wall along the line at Staff Room for review due to reduced shear wall length
[Comment resolved]
Detail 15/S302 not found on S302. Please provide detail
[Comment NOT resolve – comment response by SEOR to revise reference to 15/S303; however, submitted set does not found sheet S303. Please provide sheet S303 for review. ]
Sheet S1.12
Provide structural calculation for the revised shear wall along the line at Staff Room for review due to reduced shear wall length
[Comment resolved]
Please provide calculation justify wood post (6x12) deflection is adequate
[Comment resolved]
Sheet S1.13
See comments on Sheet S1.12
[Comment resolved]
Sheet S1.14
See comments on Sheet S1.12
[Comment resolved]
Sheet S1.21
Detail 15/S302 not found on S302. Please provide detail
[Comment NOT resolve – comment response by SEOR to revise reference to 15/S303; however, submitted set does not found sheet S303. please provide Sheet S303 for review.]
Sheet S501
Detail 3/S501: verify welding note. Not clear
[Comment resolved]
Sheet S612
Detail 5/S602:
Provide structural calculation justify connection and frame members capable to sustain 5000 lb design load
[Comment NOT resolve – Enercal calculation shown Wood Column Design for the EBM tie-back design. Should it be beam design? Please clarify and provide calculation. See additional comments (12/6/2022) #4 for addition comment.]
Provide/indicate on plan the location(s) of EBM tie-back
[Comment resolved]
Structural Additional Comments (12/6/2022)
Please include sheet S602 in the resubmitted set. Detail 5/S602 is an added detail.
Please verify that S1.12, S1.13, S1.14, S1.21, S1.22, S1.23, S1.24, S3.01, S601, S602, S612, and S621 are a part of this revision. There were changes to the original approval drawing, and these pages were include in the original revision set and are removed from the back-check set. Please verify and include above mentioned pages.
Please verify if there are any EBM tie-back support to Building 1146. Please indicate on plan Sheet S1.24 if occur.
Provide calculation to justify that when 2- EMB Tie-Back occur on the same beam (Building 1136, Unit D1 – Sheet S1.15)
Please provide construction detail indicate how is the shear (5000lb) of the tie-back system going to be dissipate into diaphragm. Please note, additional comment #4 at Building 1136, shown possible 2-EMB occur at the same location (10000 lb).
END OF COMMENTS