PLAN CHECK NO:
101112818
PROJECT ADDRESS:
214 S Birch St
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/21/2022
INITIAL REVIEW
12/6/2022
EXPIRATION
5/20/2023
RECHECKS:
1.12/22/2022
PROJECT APPLICANT CONTACT PERSON:
2.
Jamie Dalinghaus
3.
TEL:
(951)473-0577
FAX:
VALUATION:
EMAIL:
Jamie@dalinghausconstruction.com
FLOOD ZONE: X-0602320276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Residential Code (CRC); 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☐Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☐Police Department approval on the corrected/final set of drawings (647-5840).
☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DrawingsSheet 2Revise sheet number in detail references to refer to new sheet.Please note if beams are new or existing where beams are shown on plans (e.g. at #8-11 and 12-18) for clarity.Verify if new foundation occurs at supports #1, 3, and 5. Provide detail for new foundation interaction with existing foundation. PC #2: Provide detail for new PPB #1, 3, and 5 at bottom to existing foundation or specify on drawings how these new PPB’s will be anchored at bottom. PC #1 response mentions no new foundation at these spots. Provide detail for proposed new Carbon Fiber Wrap specifying location at stem wall. Verify note on plan “REPLACE SECTION OF FTG @ PIER #4”. No new foundation extent is shown on plan, please provide.Provide end connection detail for new 4x6 girder beam atop #19 and 20.PC #2: Connection at ends of new 4x6 Girder is not clear. Please verify connections at ends near existing walls, is this new girder bearing on top of the walls?Verify if new 4x6 girder is supporting existing floor joist, provide detail showing connection of existing floor joist to new girder.New 2’x2’x2’ concrete pad in enlarged repair plan does not match foundation thickness found in C/2.5. Please revise as needed. Sheet 2.5Verify ICC 3815 specified in Re:grid documents provided and ensure product is ICC tested and approved for concrete conditions. ICC found shows only Masonry condition use.PC #2: FRP product shall be ICC tested and approved for concrete application. The ICC for the FRP with the epoxy combination provided does not meet the proposed concrete conditions. ICC 4094 for the epoxy product does not cover FRP and does not apply. Detail B – Provide new Simpson anchor size, embed, and ICC #.Detail B – Verify if foundation under PPB-107 is new or existing.Detail D – Provide vertical rebar size and spacing.Detail D – Verify footing dimensions with plans, new continuous foundation on plans are scaled larger than 18”. (End of Comment)