PLAN CHECK NO:
101111891
PROJECT ADDRESS:
2390 S Redhill Ave Bldg# P
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.org
jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
I B
OCCUPANCY CLASSIFICATION(S):
S-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
9/21/2022
INITIAL REVIEW
10/25/2022
EXPIRATION
3/20/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Heidi Hare
3.
TEL:
(949)246-0492
FAX:
VALUATION: $22,700,000.00
EMAIL:
heidi@jlhare.com
FLOOD ZONE: X-0602320279J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.
GENERAL REQUIREMENTS
Clearances - Please obtain approval from the following agencies prior to permit issuance:
Planning Division – After the building division’s approval, request a planner to stamp the plans that building division approves.
Public Works Agency (PWA) – After the building division’s approval, obtain a PWA clearance if any of the following apply: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation).
Police Department (PD) – After the building division’s approval, request a PD reviewer to stamp the plans that building division approves.
Orange County Fire Authority (OCFA) - Submit plans to OCFA as soon as possible if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria.
School District – After the building division’s approval, submit payment to the School District and keep a copy of the payment receipt.
Orange County Health Department (OC Health) – Obtain OC Health approval.
Redline Pickups Instructions - The drawings markups (redlines) are available to pick up at the Building counters. The business hour is Monday through Thursday and alternative Fridays from 8:00 am to 1:00 pm. See the Holiday and Closed Friday Schedule before you plan your visit.
Resubmittal Instructions – Please provide a written response to the Plan Check Comments. Provide two copies of the latest construction document (drawings, calculations, and others related document). Provide one additional copy of drawings for new constructions or additions. Resubmit all construction document with one of the three options below:
Resubmittal Bin:Complete the Plan Check Re-Submittal Form along with the resubmittal. The resubmittal bin is available at the City Hall Ross Annex lobby, Monday through Thursday and alternating Fridays from 8:00 am – 4:00pm. See the Holiday and Closed Friday Schedule before you plan your visit.
Walk-ins: Daily walk-ins are available for resubmittals at first come first serve basis. Please note all scheduled appointments will be served first prior to any walk-ins.
Appointment: Call the Building division at 714-647-5800 to schedule a resubmittal appointment, or contact your assigned permit counter staff for your specific project.
Plan Check Expiration – This plan-check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the plan-check expires after December 31, 2022, the new 2022 California Code of Regulations will be in effect; an expired plan designed with the 2019 California Code of Regulations will be no longer acceptable after December 31, 2022.
MEP Reviews – This review does not include Mechanical, Electrical, and Plumbing (MEP).Architectural CommentsGeneralFirst Plan Review Comment:Architect-On-Record shall stamp and sign the plans.Second Plan Review Comment: The plans are still missing the architect’s stamp and signature.Senior Plan Check Engineer, Anson So, reviewed the architectural drawings. Assistant Plan Check Engineer, Jonathan Lo, reviewed the structural drawings. See page one for contact information.GA0.1.0 – Sheet IndexMechanical, Electrical, and Plumbing (MEP) sheets are on a separate permits. Omit sheets or reference ‘Per Separate Permits’.GA0.1.1 – Under Code ClassificationParking Count - One in every six accessible parking spaces is required to be a van accessible parking space. Increase the number of van parking space to ‘2’ under Retail Parking.Delete occupancy group ‘A-3’ and the ‘200 feet’ travel distance at the Exit Travel Distance Section. There is no A-3 occupancy on this parking structure.
Revise the code section reference to ‘CBC 602.2’ at the Type of Construction.
Under Area of Refuge, revise code section reference to ‘1009.3.3 exception 2’.
Under Fire-Resistance Ratings – Mechanical Shafts, reference section 712.1.10.3 for fire rating exemption.
Revise the Vehicle Barriers code-reference section number to CBC 406.4.2.
Sheet GA2.1The 3-hour firewall along gridline ‘A’ ends at gridline ‘3’. Without the benefit of a firewall separation between gridline 1 & 3, The Fire Separation Distance (FSD) governs the fire protection level on the exterior walls and its openings. Depending on the location of the imaginary property line, the first FSD is measured from the apartment building to the imaginary property line. The second FSD is measured from the parking structure to the imaginary property line. Determine the two FSD and verify that openings does not exceed the allowable opening areas per CBC Table 705.8.[End of Architectural Comments]General StructuralClarify the extent of the ground improvement area. Please attach the ground improvement drawings to the structural plans for reference. Provide the design of the ground improvement mitigation method (listed by approved agencies. E.G. ICC) to mitigate the effects of liquefaction and for support of the porposed conventional foundation system.Per amendment of soils report, all isolated column pad footings shall be connected in at least two directions by grade beams. Please update foundation design.PC #2: Letter not found in provided resubmittal. Please provide either PDF or hard copy.Add note to the cover page of the structural plans that “The design of the ground improvement mitigation method to mitigate the effects of liquefaction and for support of the proposed foundation system shall be designed by a licensed professional and reviewed and approved by the geotechnical engineer and the structural engineer in record”Foundation design shall be reviewed by the geotechnical engineer. Geotechnical report recommendations are considered to be minimum standards. Structural calculations and drawings must meet or exceed said minimum standards. Verification of review may be by a “review stamp” on the foundation plan or by a letter on their letterhead. (1803)DrawingsSheet GS1.1Please provide address on the title block on each sheet. Provide sheet index on first sheet.PC #2: Add sheet GS6.4 to sheet index.Provide Risk Category and Analysis Procedure used for design in General notes. Code references shall be updated to current code compliancy (e.g. Analysis Procedure Used in General notes, verify analysis per comment #8)All soil reports and addendums used shall be listed in notes, including dates and numbers. Addendum for 7,000psf bearing pressure capacity shall be provided for review and file, soils report provided specifies 5,000psf capacity. Sheet GS1.8Detail 1 – Verify stud ceiling anchorage into PT slab above, is it intended to be cast in place or post installed anchorage?Detail 25 – Provide maximum equipment weight for anchorage design. Detail 27 – Provide maximum weight for wall mounted equipment.Detail 29 – Provide maximum spacing for embed plate for guardrail support. Ensure guardrail is adequate for required loading per ASCE 7-16. Or ensure architect shows adequate design. PC #2: Guardrail post spacing now located in architectural drawings nor verification of guardrail design provided. Provide reference to where guardrail spacing is located and provide calculations for guardrails.Sheet GS2.0Verify elevator pad information including thickness and rebar. Detail 23/GS1.2 & 1/GS6.3 references plans for information. If entire footing area is lower to top of elevator pad as noted on plan, identify where step is to occur where lowered foundation ends occur. Similar to comment #15, verify where lowered footing extent occurs at Grid 1/A & 11/L. Identify where step is to occur where lowered foundation ends occur. Verify column foundation sizes at Grid 11/J.6 & Grid 11/K.3 with provided calculations. Ensure wall foundation adequate with additional column loading. Sheet GS2.1Please verify intended drag system for each slab floor at all shearwalls. Justify how lateral load is to be transferred from floor diaphragm to shearwalls where not full length shearwall occurs (e.g. at perimeter concrete masonry walls adjacent to concrete shear wall at Grid 1).Provide PT strand elevation where [?-?/?”] is specified on plans (e.g. between Grid 9/K-L). Typical all PT plan sheets.Sheet GS2.1AProvide width of slab band and dimension from Gridlines where not concentric. Sheet GS2.7AVerify concrete shearwall occurance along Grid 1/D. Sheet GS2.8AVerify wall intent at middle wall between Grid 4 and 5. Is a double wall intended on level? If so, provide detail.Verify detail 28/GS1.2 specified at edges, provide parapet or reference to parapet.Verify detail 20/GS1.3 at edges where shearwall occur, provide parapet or reference to parapet at concrete wall locations. Verify stair support loading accounted for at slab, typ all slabs.Sheet GS2.9Verify if deck occurs at high roof at Grid 11/B.2.CalculationsPlease provide building drift calculation for each floor. This shall be coordinated with both Architect and Apartment Structural Engineer to confirm required gap between two buildings is accurately portrayed on drawings at all sides. (ASCE 7-16 Section 12.12.1)Please provide gravity and lateral calculations for stair & elevator popout, elevator popout dimensioned to be 18’-8” above 8th Tier. Page 17 – Verify where column at b7.4 occurs. Page 26 – Foundation design size does not match with drawings. Please revise.Page 30 – Foundation reinforcing provided at F3 is not equivalent or better than design requirement. Please revise. Page 45 – Foundation reinforcing does not match drawings. Please revise.Page 47 – Foundation design does not match drawings at location noted.Page 58 – Foundation design does not match drawings at location noted.Page 103 – Verify location of tendon, unable to locate at grid in title. PC #2: Comment not addressed.Page 414 – Verify moment DCR at base level. Additional Structural Comments:Provide Soil Engineer information on cover sheet GA0.10.(End of Comment)