PLAN CHECK NO:
101113344 &45
PROJECT ADDRESS:
3621 S Harbor Blvd Unit# 200
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/29/2022
INITIAL REVIEW
1/6/2023
EXPIRATION
6/27/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Lindsen LaFlamme
3.
TEL:
(949)632-5392
FAX:
VALUATION: $150,000.00 & $100,000
EMAIL:
LLAFLAMME@HATTOXDESIGN.COM
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer. (CBC Sections A106.1 and A106.3.4.1,)Include address and telephone number of the responsible designer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Public Works Agency approval (647-5039)Sheet A0.0. Add note to list all separate permit items. Installation of the Electric Vehicle Charging Station is under separate permit.Fire sprinkler system alteration.Sheet ST-1. Delete “for reference only” note from the site plan.Sheet ST-1. Show complete design for the proposed Electric Vehicle Charging spaces layout on the overall site plan AND make cross-reference into the design details on sheet ST-2.Sheet ST-2. Show 12 feet minimum width (not 9 feet) for the van accessible EV charging space. (11B-812.6.1)Sheet ST-2. Provide minimum 48” wide (increased spaces between future EVCSs from 21”) accessible route from EV access aisle to the 30”x48” clear floor space at the control panel of the future EV charging station in consistent with detail 13. (11B-812.5.2, 11B-402)Sheet ST-2. Detail 12. Remove “van accessible” and “minimum fine $250” signs from the EVCS identification sign. (11B-812.8.2)Sheet ST-2. Keynote #8. Add note to indicate that the installation of the EV charging stations is not part of this permit.Sheet A1.1. Indicate the use, code compliance and clarify the access to the space next to hallway (#217).Sheet A1.1. Show measurement (length and width) between partitions of the conference room (#204).Sheet A2.1. Provide 1-hour rated new corridor ceiling design and detail and make cross-reference into key note #5, located at the recessed doors. (1020)EGRESSVerify the maximum common path of travel not to exceed 100 feet on plan. (1006)Verify the maximum exit access travel distance to the interior exit stairway not to exceed 300 feet. (1017)Justify 37-occupant load. Recalculate occupant load by using 150 occ/sf in the office area, 15 occ/sf in the conference rooms (#204) and 15 occ/sf in the break rooms (#215). (1004)Sheet A1.1. On the partition plan, show existing corridor width by the lobby (#200).Sheet A1.1. Door #200. Doors, when fully opened, and handrails shall not reduce the required width by more than 7”. Doors in any position shall not reduce the required width by more than one-half. Provide egress analysis for the entire story including all occupant loads for all suites to justify the door encroachment. As an option, design recessed doors to avoid door swings into the existing corridor. (1005.7.1)The exit signs shall be readily visible from any direction of egress travel and clearly indicate the direction of egress travel. (CBC 1013)Note on plans: “Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.”Note the following on the plans: “The means of egress, including the exit discharge, will be illuminated to a level of not less than one foot-candle at the walking surface at all times the building space served by the means of egress is occupied”Note on the plans: “Exit signs shall be internally or externally illuminated at all times. Externally illuminated exit signs shall be connected to an emergency power system (batteries, unit equipment or an on-site generator) that will automatically illuminate the exit signs for a duration of not less than 90 minutes in case of primary power loss.”Doors equipped with a key operated locking device shall have a readily visible, durable sign posted on the egress side adjacent to the door stating: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED. The sign shall have one-inch high letters on a contrasting background. E.g. door #200.ACCESSIBILITYShow detailed information, including dimensions, on existing accessible parking to verify conformance with the current requirements (along the accessible path of travel) (CBC 11B-502, 11B-405, 11B-603 through 11B-606.7)Sheet A5.1. Detail 19 and 20. Revise mounting height for wall-mounted signage. Tactile characters on signs shall be located 48 inches minimum above the finish floor or ground surface, measured from the baseline of the lowest Braille cells and 60 inches maximum above the finish floor or ground surface, measured from the baseline of the highest line of raised characters. Refer to Figure 11B-703.4.1. (11B-703.4.1).END OF COMMENTS