Loading...
HomeMy WebLinkAbout296829_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101113353 PROJECT ADDRESS: 1347 N Santiago St PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/30/2022 INITIAL REVIEW 1/10/2023 EXPIRATION 6/28/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Frank Wright 3. TEL: (310)750-8939 FAX: VALUATION: $71,465.00 EMAIL: fwright082@gmail.com FLOOD ZONE: X-0602320163J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. Pick up plan (check set) for additional comments marked on the drawing.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)PLAN CHECK COMMENTSNo additional comments on planKeynote #5 on sheet A-401. Clarify with the structural engineer to specify plywood sheathing shown on the structural details.STRUCTURALNo additional comments on planAll sheets. Provide project address on the title block on each structural sheet.Sheet S-0.11. Add note to plan that structural observation is required to verify the structural integrity of the existing diagonal bracing for seismic and wind resistance.Specify sheathing material in detail 8/SD1.0. Provide in-plane bracing for the new CFS stud walls. (Do not refer the in-plane bracing structural design to arch. plan)Detail 9/SD1.0. Indicate the distance to locate the connector of the end of tension rods to the steel columns, measured to the top of the girder or to the slab.Please read building east and west elevations on sheet A-801. Provide structural design and details for the new ±14Hx18W openings to support the existing walls. Provide framing of the doors. Design beams and columns to support the gravity and out-of-plane load and continuous load path to the footing. Show connection details of the structural members including the existing horizontal girts attached to the column, top and bottom of the column connections and footing anchorage.END OF COMMENTS