Loading...
HomeMy WebLinkAbout290367_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101111303 PROJECT ADDRESS: 2400 S Pullman St Unit# B PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/21/2022 INITIAL REVIEW 8/5/2022 EXPIRATION 1/17/2023 RECHECKS: 1.11/20/2022 PROJECT APPLICANT CONTACT PERSON: 2.12/24/2022 Herman Ajamian 3. TEL: (714)313-6815 FAX: VALUATION: $120,000.00 EMAIL: hja@kobradesign.net FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout.Sheet ST1.0: On the plan, please clearly show location of detectable warning where required. Provide enlarged plans as necessary. 2nd Review Comment: The locations of truncated provided on plan were insufficient. Please provide enlarged plan to show where the truncated is required. The detectable warning shall be placed/provided in such a correct location so that it would give the persons with visually impaired warning before crossing into a vehicular area. The truncated dome should not place within the required door landing. 3rd Review Comment: Response was incomplete. Please revise site plan to provide truncated dome where a walk is crossed a vehicular area (ex. At the corner of the building, outside of the door landings). Please see marked-up plan. Sheet a0.1: 2nd Review Comment: Door ‘C’ at hallway adjacent to Video Surveillance room – Please remove doorway or revise plan to show door swing in the direction of travel (outward).3rd Review Comment:Plan was not revised.Sheet a1.0: 2nd Review Comment: Door ‘C’ at hallway adjacent to Video Surveillance room – Please remove doorway or revise plan to show door swing in the direction of travel (outward). 3rd Review Comment: Plan was not revised. Please comply. Sheet a6.0: Accessible restroom floor plans: Please show dimensions for the required clear floor area. 2nd Review Comment: Restroom 2 – Please show maneuver spaces on both sides of door. Provide door schedule and door hardware. Door shall be accessible to persons with disabilities. 3rd Review Comment: Detail 3 on sheet a6.0 (second floor restroom) – please revise plan to provide minimum 60” clear space for the water closet; measured from the side wall to the edge of the sink. Structural Review Comment: New opening created for exterior door: Please provide structural calculation and details for new opening in existing walls. 2nd Review Comment: Details shall be clearly cross-referenced onto the plan so that it can be easily located. 3rd Review Comment: it appears that new openings are provided for the new exterior doors – Please provide structural details for the new wall opening and clearly cross-reference detail onto the plan. Provide structural calculation and details for equipment and tanks. 2nd Review Comment: Could not locate details and calculation for the water tanks. 3rd Review Comment: Detail 104/S-401 – X braces at top of the water tank were insufficient. Please provide detail to show connection of the L strap to the top of the water tank. And, specify maximum height of the tank. (End of Comment)