Loading...
HomeMy WebLinkAbout297039_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101113411 PROJECT ADDRESS: 2701 W MacArthur Blvd PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/11/2023 INITIAL REVIEW 1/22/2023 EXPIRATION 7/10/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. SarareeJirattikamchote 3. TEL: (562)310-8118 FAX: (714)892-3944 VALUATION: $5,000.00 EMAIL: blue_cmdesign@yahoo.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note ā€œN/Aā€ and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.The Architect on Record shall stamp and sign all of the architectural drawings.Sheet CV1.0: Under Drawing Index, all structural details are shown on sheet CV1.3. List sheet CV1.3 under the Drawing Index.Sheet CV1.0: Under the Building Data, revise the occupancy group to ā€œUā€ for the canopy structure.Sheet CV1.0: Under the Building Data, specify the area of the shaded canopy.Sheet A0.1: Show a dimension between the proposed canopy and the existing building.Sheet A0.1: On the plan, show the footing locations with dimensions from a known location such as the building or enclosure wall adjacent to it.Sheet A0.1: Specify the type of shading material on plan.[The End]