HomeMy WebLinkAbout295766_2_Corrections.docxSPC
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101112986
PROJECT ADDRESS:
2010 E Warner Ave Bldg# P
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
I B, SPK
OCCUPANCY CLASSIFICATION(S):
A-3, S-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/15/2022
INITIAL REVIEW
12/29/2022
EXPIRATION
6/13/2023
RECHECKS:
1.1/24/2023
PROJECT APPLICANT CONTACT PERSON:
2.
Steven Finkelberg
3.
TEL:
(949)533-6852
FAX:
VALUATION:$10,000.00
EMAIL:
steven.finkelberg@greystar.com
FLOOD ZONE:X-0602320279J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSPlease indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.PC2: Not resolved. Please response to each item in writing.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714) 573-6100).PC2: This item will be checked at the permit insurance.Resubmit plans.Please increase the size of plans to match the scale shown on the drawings (e.g. GS2.7A) and increase text height on plan to be legible.On next submittal, remove all electrical sheets from building plan review set, except the equipment specification for reference.PC2: Provide response in writing as requested refer to comment #1. Please remove GE sheets.Provide the narrative of the description of the scope on the first sheet of the building plan review set.PC2: Provide response in writing as requested refer to comment #1.The current cover sheet shown is sheet GS1.8. Provide the narrative of the scope of work of this permit on sheet GS1.8.EX: Scope of work: Installation of a 7000 pound emergency backup generator.Provide structural calculation to design and verify the equipment anchorage to the concrete slab as shown in detail 21/GS1.8. [ASCE 7-16, Sections 13.1]PC2:To Seneca Engineer. The following corrections apply to the submitted calculation:Provide project address on the cover page of the structural calculation.Provide page number on each calculation page.Provide a diagram showing the plan layout of the anchor bolts with spacing, edge and end distance in the concrete slab called out.Attach page 92 for unit information into the structural calculation as indicated on the page 2 of this calculation. There is no page 92 in this submittal.Cross-reference detail 21/GS1.8 into the applied location on sheet GS2.7A with clouds to indicate the scope of work area.PC2: To Seneca Engineer: please provide a bubble with detail 21/GS1.8 referenced to the applicable location. It is similar to all your other cross-referencing. Cloud the area on plan to show the extent of the scope under this generator permit on all sheets.PC2: To Seneca Engineer:Please cloud the scope of work location on sheet GS1.8.END OF COMMENTS