HomeMy WebLinkAbout297643_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101113615
PROJECT ADDRESS:
1342 S Baker St Unit# 2
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/25/2023
INITIAL REVIEW
3/1/2023
EXPIRATION
7/24/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Leon Tran
3.
TEL:
(714)418-6604
FAX:
VALUATION: $50,000.00
EMAIL:
Trandesign7@gmail.com
FLOOD ZONE: X-0602320257J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY):
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☒Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☒Police Department approval on the corrected/final set of drawings (647-5840).
☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☒Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DocumentationAll stamped sheets shall be signed.DrawingsSheet A1
Provide the following design data on the first sheet (R106.1.1)
☐Sheet Index
☐Occupancy groups (R-3/U)
☐Type of construction (V-B)
☒Automatic Fire Sprinkler (YES or NO)
☒Number of stories.
☐Flood Zone: X
☐Flood Zone: A
☐Flood Zone: AE
☐Floor area per occupancy group, including the existing structure(s)
☒Construction shall comply with the 2022 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.Add sheet A5.1 to sheet index.Sheets CG1 and CG2 are not provided in submittal, provide sheets in set.Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.Add note on the coversheet: Photovoltaic system will be submitted under a separate permit and shall be issued prior to building frame inspection request.Sheet A2Provide window and door identification on plan to match Window Schedule and Door schedule.Provide new roof specs including type, ICC #, etc. Matching existing is not adequate.Verify attic vents noted on Elevations with attic ventilation calculations. Sizes do not look to match.Verify door and window location on South Elevation with Floor Plan. Locations do not look to align.
Attic access and Ventilations –
☒Show location(s) of 22" x 30" attic access with 30" minimum clear headroom. (R807.1)
☐Show on the plans - attic vent locations, type and size (area = 1/150 of the attic space). Provide an attic cross ventilation summary; on the plans indicate the total area required versus provided. (R806.1)
☐If applicable, for an FAU located in the attic, provide a minimum access of 22 x 30 inches, a 24-inch wide walkway, a 30-inch deep work platform, and electric light outlet adjacent to the furnace and switched by the opening. (CMC 904.11 & 305)Specify tempered window at window adjacent to entrance door.Verify north arrow on Floor Plan with Site Plan. Revise as needed.Sheet A5Provide ceiling height on plans or elevations.Verify all detail references on Framing Plan, reference callouts do not look to match intended details.Add holdown at each shear wall otherwise provide calculations for no uplift justification.Provide detail for interior non-bearing wall top connection. Top connection shall be slip connected with a gap between wall and supporting frame. Sheet A5.1Fill out City Patio Cover Form to match intended design. Ensure all proposed design meets form requirements, else engineering required.Sheet T1Title 24 Conformance shall meet 2022 codes. Revise certification to current code version. (End of Comment)