HomeMy WebLinkAbout297039_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101113411
PROJECT ADDRESS:
2701 W MacArthur Blvd
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/11/2023
INITIAL REVIEW
1/22/2023
EXPIRATION
7/10/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
SarareeJirattikamchote
3.
TEL:
(562)310-8118
FAX:
(714)892-3944
VALUATION: $5,000.00
EMAIL:
blue_cmdesign@yahoo.com
FLOOD ZONE: X-0602320258J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note āN/Aā and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.The Architect on Record shall stamp and sign all of the architectural drawings.Sheet CV1.0: Under Drawing Index, all structural details are shown on sheet CV1.3. List sheet CV1.3 under the Drawing Index.Sheet CV1.0: Under the Building Data, revise the occupancy group to āUā for the canopy structure.Sheet CV1.0: Under the Building Data, specify the area of the shaded canopy.Sheet A0.1: Show a dimension between the proposed canopy and the existing building.Sheet A0.1: On the plan, show the footing locations with dimensions from a known location such as the building or enclosure wall adjacent to it.Sheet A0.1: Specify the type of shading material on plan.[The End]