Loading...
HomeMy WebLinkAbout298197_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 103113797 PROJECT ADDRESS: 1551 N Tustin Ave Unit# 190 PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: II A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/8/2023 INITIAL REVIEW 2/11/2023 EXPIRATION 8/7/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Sheila Andelin 3. TEL: (949)757-6996 FAX: (949)757-6999 VALUATION: $50,000.00 EMAIL: o3designinc@icloud.com FLOOD ZONE: X-0602320164J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Please return marked up set of drawings with corrections.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039)PLAN CHECK CORRECTIONSApplicable Codes: Add a note that the applicable Codes are: 2022 CBC, 2022 CPC, 2022 CMC, 2022 CEC, 2022 Energy Code, and City of Santa Ana Municipal CodeSpecify type of construction to IIA per City’s record.A long diagonal line crossing entire drawing shown on multiple sheets. Please remove it.Refer to partition plan on sheet A2, provide a minimum clear opening width of 32 inches and 80 inches minimum clear opening height of egress door on the glass partition. The clear opening width of doorways with swinging door shall be measured between the face of the door and the stop, with the door open 90 degrees (1.57 rad). Specify sliding glass door dimensions on detail 9/D1 to justify.Sheet A2. Partition plan 1. Clarify the use of the room 101. If it is as conference room, use occupant load factor to 15 occ/sf. and revise occupant load number. If it is private office, revise the room label on plan and the occupant load will not change.Sheet A2. Partition plan 1. Room 101. Egress doors shall be of the side-hinged swinging door, pivoted door, or balanced door types, except private office with an occupant load 10 or less. (1010.1.2)Sheet A2. Partition plan 1. Provide furniture, cubicle, tables and etc layout on paln to maintain minimum 44 inches wide egress route to the egress door.END OF COMMENTS