Loading...
HomeMy WebLinkAbout296957_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101113390 PROJECT ADDRESS: 1522 E Portola Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/5/2023 INITIAL REVIEW 2/1/2023 EXPIRATION 7/4/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Robert Dorn 3. TEL: (831)247-9932 FAX: VALUATION: $10,000.00 EMAIL: r.adamdorn@gmail.com FLOOD ZONE: X-0602320163J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. PLAN CHECK COMMENTS: Non-structural All sheets. Update project address: 1522 E Portola Avenue. Sheet A0.0. Indicate 2022 California Building Code and 2022 California Energy Code (not standards) as part of the applicable codes. Structural All structural sheets and the cover page of structural calculation. Update project address: 1522 E Portola Avenue. This project is submitted after 1/1/2023. Please update the applicable code version to 2022 CBC on the general notes on sheet S0 and in the structural calculation. Update structural beam calculation to comply with 2022 CBC and 2021 IBC as shown in the “code reference”. END OF COMMENTS