HomeMy WebLinkAbout294362_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
103112527
PROJECT ADDRESS:
2515 S Main St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B
OCCUPANCY CLASSIFICATION(S):
F-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/17/2022
INITIAL REVIEW
12/15/2022
EXPIRATION
5/16/2023
RECHECKS:
1.2/24/2023
PROJECT APPLICANT CONTACT PERSON:
2.
Alondra Martinez
3.
TEL:
(909)802-2050
FAX:
VALUATION: $9,000.00
EMAIL:
alondra.eth@gmail.com
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.Clearly indicate the scope of work under this building permit application:Pending 2/24/23
- Revise project job description on the building permit application worksheet to reflect the work to be done
under the subject building permit application.
- Construction drawings must clearly show all work to be done under the subject building permit application.
- Delete all notes and details from drawings that are not a part of the work to be done under the subject building
permit application. This includes mechanical, plumbing and electrical work that is not specifically required by
the Building Code.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer. Pending 2/24/23This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Pending 2/24/23 spray booth price shall be included) Please have OCFA approval before resubmittal.Pending 2/24/23 ( OCFA need to review spray booth, permit provided is for use of the building)Provide complete floor plan showing location of spray booth and show exiting plan.Pending 2/24/23
- Provide a fully dimensioned Floor Plan.Floor plan shall include all the offices , bathrooms, exit doors.Provide complying exiting plan for the area. Pending 2/24/23 , show all the exit doors on the floor plan and site plan .1022.2.2. Exterior exit doors shall lead directly to the exit discharge or the public way. ( Show on the site plan and floor plan)Pending 2/24/23EXIT DISCHARGE. That portion of a means of egress system between the termination of an exit and a public way. Pending 2/24/23 Show on the site plan.Provide ICC report or third party listing/report for the spray booth.Provide a listing report. Pending 2/24/23Provide all anchorage detail from calculation on the drawings with the engineer stamp.Pending 2/24/23 show all the dimension on the drawings to include top view and show location of anchor points.Exhaust fan shall be minimum 10 feet away from the property line .Pending 2/24/23 Mechanical plan checker asked for 30’ away from the property line , please provide dimension to match mechanical drawings. Provide support for the exhaust fans over 3’ high on the roof.Ok 2/24/23Note on the cover sheet “ Special inspection is required for the type of anchorage” ok 2/23/24 2/24/23Provide engineering calculation and detail for the roof screening, please see planning.