HomeMy WebLinkAbout294487_3_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101112558
PROJECT ADDRESS:
1610 W Edinger Ave Unit# C
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/14/2022
INITIAL REVIEW
12/4/2022
EXPIRATION
5/13/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
David Chong
3.
TEL:
(213)254-5341
FAX:
VALUATION: $20,000.00
EMAIL:
david@blenddesignla.com
FLOOD ZONE: X-0602320257J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSAll items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.
GENERAL REQUIREMENTS
Clearances - Please obtain approval from the following agencies prior to permit issuance:
Planning Division – After the building division’s approval, request a planner to stamp the plans that building division approves.
Public Works Agency (PWA) – After the building division’s approval, obtain a PWA clearance if any of the following apply: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation).
Police Department (PD) – After the building division’s approval, request a PD reviewer to stamp the plans that building division approves.
Orange County Fire Authority (OCFA) - Submit plans to OCFA as soon as possible if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria.
School District – After the building division’s approval, submit payment to the School District and keep a copy of the payment receipt.
Orange County Health Department (OC Health) – Obtain OC Health approval.
Redline Pickups Instructions - The drawings markups (redlines) are available to pick up at the Building counters. The business hour is Monday through Thursday and alternative Fridays from 8:00 am to 1:00 pm. See the Holiday and Closed Friday Schedule before you plan your visit.
Resubmittal Instructions – Please provide a written response to the Plan Check Comments. Provide two copies of the latest construction document (drawings, calculations, and others related document). Provide one additional copy of drawings for new constructions or additions. Resubmit all construction document with one of the three options below:
Resubmittal Bin:Complete the Plan Check Re-Submittal Form along with the resubmittal. The resubmittal bin is available at the City Hall Ross Annex lobby, Monday through Thursday and alternating Fridays from 8:00 am – 4:00pm. See the Holiday and Closed Friday Schedule before you plan your visit.
Walk-ins: Daily walk-ins are available for resubmittals at first come first serve basis. Please note all scheduled appointments will be served first prior to any walk-ins.
Appointment: Call the Building division at 714-647-5800 to schedule a resubmittal appointment, or contact your assigned permit counter staff for your specific project.
Plan Check Expiration – This plan-check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the plan-check expires after December 31, 2022, the new 2022 California Code of Regulations will be in effect; an expired plan designed with the 2019 California Code of Regulations will be no longer acceptable after December 31, 2022.
MEP Reviews – This review does not include Mechanical, Electrical, and Plumbing (MEP).
Sheet A.001
Provide a vicinity map.
Does building number 2 equip with fire sprinkler system? If it does, the attached portion of the building requires fire sprinkler system. Identify if the existing is or is not equipped with a fire sprinkler system under Project Data.
Under Drawing Index, correct the typo on the last structural sheet number.
Since the 229 square-foot storage room is under a separate permit, reference to the 229 square-foot addition under permit number 101110595 and revise the scope of work to 121 square-foot storage addition.
1ST PC Comment: Under Project Data, The storage building is technically not an accessory occupancy since the total floor area of the storage spaces are greater than 10% of the primary occupancy. Delete the word ‘accessory’ under Occupancy and Overall Building Height.
2nd PC Comment: Delete “(P) Accessory BLDG” under Project Data.
1st PC Comment:Show an accessible route from the accessible parking stalls to the entrance of the storage room.
2nd PC Comment:
The accessible route ends at the middle of the parking stall. The accessible route shall be continuous to the entrance of the building.
Provide handrails design for the ramp.
List the ramp construction under scope of work.
Show the top landing, ramp run, and bottom landing with dimensions on the site plan.
Show width of the bottom landing and ramp.
Specify the threshold dimension at the proposed door.
3rd PC Comment:
Only one handrail is shown on sheet A.100. Provide two handrails on the ramp.
Sheet A.100: The bottom landing shall be 72-inches minimum in the direction of ramp run.
Sheet A.100: Ramp handrails shall extend horizontally above the landing for 12 inches minimum beyond the top and bottom or ramp run. Handrail gripping surfaces shall extend beyond and in the same direction of ramp runs in accordance with Section 11B-505.10.
1st PC Comment:Provide information of the accessible route such as width, slope in direction of travel, cross slope, and floor surface specifications.
2nd PC Comment: Specify slope in direction of travel and cross slope.
Sheet A1.00
1st PC Comment:The egress route from building number 2 is traveling through the proposed the storage room, which is not allowed.
2nd PC Comment: The item remains outstanding.
3rd PC Comment: There is no physical barrier between the existing storage room and the “hallway”.
1st PC Comment:Provide information on the egress door. Provide all necessary egress door requirements such as width, height, opening force, hardware type, hardware height…etc.
2nd PC Comment: Provide information on opening force and hardware type.
3rd PC Comment: The door hardware type is not specified.
Floor plan shows a sink in the storage room. Provide accessible details for knee-and-toe clearance.
Identify that the 229 square foot storage room is under a separate permit.
Sheet S1.00
Identify that the 229 square foot storage room is under a separate permit.
Additional Structural Comment: Provide one additional set of structural calculations for approval.
[The End]