HomeMy WebLinkAbout298731_1_Corrections.docxPLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101113987
PROJECT ADDRESS:
2320 S Bristol St
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
A-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
2/21/2023
Revision to PC# 101110073
INITIAL REVIEW
2/22/2023
EXPIRATION
8/20/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Jacqueline Salazar
3.
TEL:
(949)473-9398
FAX:
VALUATION:
EMAIL:
jaqueline@resolutecontractors.com
FLOOD ZONE: X-0602320259J
APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Please provide revised floor plan (sheet A1.0) with revised wall schedules. Details on sheet A5.1 referenced to detail 8/A5.0 & 10/A5.0 for wall support at roof/ceiling were not applicable. Please provide to show connection/attachment of new metal track and bracing to roof trusses and blockings. Show fasteners specification. Details shall be clearly cross-referenced onto the plan. Detail 10/A5.1: Please revise detail to show attachment of metal track and bracing to structural roof trusses / blockings above. Specify fasteners. (End of Comment)