Loading...
HomeMy WebLinkAbout298731_1_Corrections.docxPLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101113987 PROJECT ADDRESS: 2320 S Bristol St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): A-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/21/2023 Revision to PC# 101110073 INITIAL REVIEW 2/22/2023 EXPIRATION 8/20/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jacqueline Salazar 3. TEL: (949)473-9398 FAX: VALUATION: EMAIL: jaqueline@resolutecontractors.com FLOOD ZONE: X-0602320259J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Please provide revised floor plan (sheet A1.0) with revised wall schedules. Details on sheet A5.1 referenced to detail 8/A5.0 & 10/A5.0 for wall support at roof/ceiling were not applicable. Please provide to show connection/attachment of new metal track and bracing to roof trusses and blockings. Show fasteners specification. Details shall be clearly cross-referenced onto the plan. Detail 10/A5.1: Please revise detail to show attachment of metal track and bracing to structural roof trusses / blockings above. Specify fasteners. (End of Comment)