Loading...
HomeMy WebLinkAbout297223_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101113474 PROJECT ADDRESS: 402 W Park Ln PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/12/2023 INITIAL REVIEW 1/24/2023 EXPIRATION 7/11/2023 RECHECKS: 1.2/23/2023 PROJECT APPLICANT CONTACT PERSON: 2. Nazaret Khobiarian 3. TEL: (818)237-8741 FAX: VALUATION: EMAIL: nazaret@karabachian.com FLOOD ZONE: AE-0602320163J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. 5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.DrawingsSheet A3-201Provide insulation required per T24 where R-XX is noted in Section 1 and 3.Sheet S-1Detail 3/S-4 referenced in interior foundation shows post atop footing and slab on grade. Please provide detail for raised floor condition, verify if post is to span through floor and if any floor sheathing connection is required.Provide detail for new post atop continuous foundation along Grid B. New pad footing is shown but detail 3/S-4 is referenced which does not match condition shown. Sheet S-2Provide KP size at all locations required.Verify Detail 11/S-5 referenced at middle post of patio cover. Provide detail for ridge beam support or if a KP is required, current detail shows post underside perimeter beams. Verify detail 13/S-5 referenced at ridge beam where no KP occurs.Provide detail for new 6x12 beam to post shared with CBM5 with interaction consideration.Provide post sizes at all locations where detail 5/S-5 is referenced.Sheet S-3Justify 2x12 ridge board atop garage where ceiling joist are parallel else design as fully supported ridge beam. PC #2: Rafter ties provided shall be at a height no more than 1/3” the vertical height from the top of the rafter support wall, not from the top of ridge. (End of Comment)