HomeMy WebLinkAbout298947_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
102114059
PROJECT ADDRESS:
829 N Garfield St
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
U, R-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/28/2023
INITIAL REVIEW
11/28/2023
EXPIRATION
5/26/2024
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Luis Soto
3.
TEL:
(858)437-4247
FAX:
VALUATION: $40,000.00
EMAIL:
luis@lsrbuilders.com
FLOOD ZONE: X-0602320163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY):
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☒Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☐Police Department approval on the corrected/final set of drawings (647-5840).
☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DocumentationDrawings shall be completed and stamped by a licensed Architect.Any exterior work that has been completed outside of scope of work shall be added to drawings/scope of work and brought back to the Planning Division for review and approval. Revisions completed may require structural design. It is advised to accurately portray all work that has been completed or to be completed. Any structural work deemed to have been completed shall require a licensed civil engineer. Drywall replacement shall be noted to be fire rated where required per 2022 CBC. Licensed architect to provide details for proposed fire rated system on walls and ceiling as required.(End of Comment)