HomeMy WebLinkAbout294893_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112699 PROJECT ADDRESS: 3423 W Fordham Ave PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/21/2022 INITIAL REVIEW 11/26/2022 EXPIRATION 5/20/2023 RECHECKS: 1.3/4/23 PROJECT APPLICANT CONTACT PERSON: 2. Davit Vardanyan 3. TEL: (818)823-0016 FAX: VALUATION: $295,000.00 EMAIL: artdesignusa1@gmail.com FLOOD ZONE: X-0602320256J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.Clearly indicate the scope of work under this building permit application: - Construction drawings must clearly show all work to be done under the subject building permit application. - Delete all notes and details from drawings that are not a part of the work to be done under the subject building permit application. This includes mechanical, plumbing and electrical work that is not specifically required by the Building Code.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Orange County Sanitation District (714) 593-5756 - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Pending 3/4/23Drawings must be to scale and be on 18” x 24” minimum sheets. Ok 3/4/23 - Show North Arrow on Plan ViewsProvide the following:ok 3/4/23 - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan. - Show all property lines of record on the site plan. Show compliance with CBC Section 704 and CBC Tables 601, 602, and 704.8.Occupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers.Ok 3/4/23Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process.Pending 3/4/23 Not foundIndicate detail and section references as to their appropriate location on planview.Ok 3/4/23 Identify use of the ramp next to the building.Ok 3/4/23 Floor plan on sheet A1.5 doesn’t match floor plan on sheet A-1.2.Ok 3/4/23 Sheet A-1.2, please verify if the demising wall is new or existing .( is unit 3423 a new unit?)ok 3/4/23 Please note if Demo’d walls are non-bearing wall.Ok 3/4/23 Show all the tables and equipment in all growing rooms and Clone room on exiting plan.Pending 3/4/23 provide exiting plan when the tables are moved There is a discrepancy is there a break room or there is a locker room, please clarify, see sheet A-1.5 and A-1.2.ok 3/4/23 Enlarge Hallway to show all the fixtures and furniture.Pending 3/4/23, - show height of the Microwave complies with accessibility _ provide legroom for the sink in the breakroom.CBC Section 708.4, Fire partitions shall extend from the top of the foundation or floor/ceiling assembly below to the underside of the floor or roof sheathing, slab or deck above or to the fire-resistance-rated floor/ceiling or roof/ceiling assembly above, and shall be securely attached thereto. If the partitions are not continuous to the sheathing, deck or slab, and where constructed of combustible construction, the space between the ceiling and the sheathing, deck or slab above shall be fire-blocked or draft-stopped in accordance with Sections 717.2 and 717.3 at the partition line. The supporting construction shall be protected to afford the required fire-resistance rating of the wall supported, except for tenant and sleeping unit separation walls and corridor walls in buildings of Types IIB, IIIB, and VB construction.Pending 3/4/23 -provide architectural detail to comply with gypsum board manual or CBC chapter 7. Provide detail from foundation to the structure above.Provide typical section view detail of all new partitions and ceilings showing: ok 3/4/23 - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above. Provide fire blocking in concealed spaces of stud walls and partitions.Pending 3/4/23, provide the note on architectural plan.CBC Sections 1028.5 and 1022.1. Exiting from any occupied point in a building or structure on the subject site must be continuous, unobstructed, and undiminished to a public way. This includes gates which must show compliance with CDB Section 1008.2. Revise drawings to show compliance.\Pending 3/4/23, show the gate complies with exiting and accessibility.Please show which door is an exit door to outside from the clone door, and mark as an exit. Ok 3/4/23CBC Section 1028.5, Access to a public way. The exit discharge shall provide a direct and unobstructed access to a public way.Pending 3/4/23 show gate complies. Provide landing at both sides.Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.” Ok 3/4/23All doors require a level floor landing on each side in accordance with CBC Sections 1010.1.5. Provide typical door threshold details and details of change in floor covering material.Pending 3/7/23, truncated domes cannot be on required landing .Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements. Pending 3/4/23 , show for all doors including interior. Provide elevation for the new gate and door for Co2 tanks.Pending 3/4/23 Provide 48 “ landing for Co2 Gates.Provide size of the new door in roll up door and provide landing on both sides.Ok 3/4/23CBC Sections 11B-303. Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.ok 3/4/23Provide 60” landing at both side door D1 for growing room #2.Pending 3/4/23 .Show when tables move toward doors.Provide minimum 48” clearance between door D1 and door EE(3).Ok 3/4/23 Provide minimum 12” clearance to the strike edge of door EE(3).Ok 3/4/23 Provide detail for pedestrian gate to show complies with accessibility.pending 3/4/23Show landing and the gate is openable with use of key.CBC Section 11B404.2.7Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction. Ok 3/4/23Exit illumination and exit sign requirements in accordance with CBC Section 1013shall be shown on the drawings. Be specific as to the type of exit signs to be installed.Ok 3/4/23Tactile exit signs shall be required at the following locations:Pending 3/4/23, show the locations on the floor plan - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit door that leads directly to a grade-level exterior exit by means of an exit enclosure, or an exit passageway, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4: - An accessible entrance - An accessible route to the altered areaPending 3/4/23, provide slope from the parking to the building. - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, andPending 3/4/23 provide Alcove - Parking, signage and alarms Pending 3/4/23, provide detail , enlarge the parking and call out details on the plan. The accessible route of travel shall be the most practical direct route between accessible building entrances, accessible site facilities, and the accessible entrance to the site. Pending 3/4/23, provide slope and show compliance with CBC 11B.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 11B-247.1.2.5Pending 3/4/23, Detectible warning cannot be on the landing.Each lot or parking structure where parking is provided for the public as clients, guest or employees, shall provide accessible parking as required by CBC Section 11B-502.Ok 3/4/23CBC Section 11B-208.2.4. One in every six accessible spaces, but not less than one, shall be served by an access aisle 8’-0” (96”) wide minimum and shall be designated van accessible as required by Section 11B-502. The words NO PARKING shall be painted on the ground within each eight’ loading and unloading access aisle. This notice shall be painted in white letters no less than 12” high and located so that it is visible to traffic enforcement officials. Ok 3/4/23Sanitary facilities serving the area of new work shall be disabled accessible. Revise the drawings to show compliance with CBC 11B-603 and 11B-604.3.1 ok 3/4/23Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC Section 11B-603, 11B604 and the California Plumbing Code.Ok 3/4/23Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.Ok 3/4/23Provide complete grab bar details on the drawings showing compliance with CBC Section 11B-603.3 including structural strength to support a 250 pound point load.Pending 3/4/23, provide detail.CBC Section 11B-606.5. Note on the drawings hot water and drain pipes under lavatory shall be insulated.Ok 3/4/23Ensure sanitary facilities comply with CBC Section 11B-603.3 and that the bottom of the mirror is no higher than 40” from the floor. Ok 3/4/23 Show the drinking fountain complies with 11B-307.4. provide guardrail or barrier. Pending 3/4/23 drinking fountain showed on sheet A1.4. Show locker room and the lockers comply with accessibility.Pending 3/4/23, show maximum and minimum height and clear floor.Complete the attached Disabled Accessibility Documentation Form.Pending 3/4/23, It has to be filled out correctly and signed. Provide calculation to show size, type of the studs for shearwall and bearing walls.Pending 3/4/23 Please remove metal studs information, since doesn’t apply. Provide size of the CO2 tanks and provide engineering calculation to show seismic and vertical load support.Pending 3/4/23, unable to find 3 /16” Titen HD on Simpson catalogue, provide ICC report and the anchor value for review.Provide seismic strap for the water heaters.Ok 3/4/23 On sheet A1.3, identify all the ceilings.Pending 3/4/23 Show if there are open ceilingProvide detail to show how T-bar ceiling supported to the structure above.Pending 3/4/23Provide size and spacing for the studs in shearwall and bearing walls.Ok 3/4/23Provide special inspection for 810 # shear wall.Ok 3/4/23For new shearwall provide size, spacing of the studs per calculation.Ok 3/4/23Provide complete shear transfer from the existing roof diaphragm to the new shear wall to include nailing size, spacing and blocking connections. For interior and exterior walls.Pending 3/4/23, provide seismic load at each shear wall and show the remaining roof sheathing can transfer the shear load from diaphragm to the shear wall.Due to modification of existing roof diaphragm, please provide wall anchorage for existing CMU wall. Provide calcs and details.Ok 3/4/233/4/23Show height of CO2 tank and water tank on the drawings to match calculation. Please show location of new steel beam 6x12, from calculation on the structural plan. For exit analysis show all the tables in the growing room and clone room in the different situations and show accessibility and exiting will comply. Show height of the microwave complies with accessibility.For new accessible parking , please add to the job description and see planning. Provide requirement for delayed egress locking system per section 1010.1.9.8.1. See OCFA Building shall have automatic smoke or heat detection system installed per section 907.Sheet A1.2, show location of new RTUs over the new bearing wall.Please pick up corrections and redmark from building permit counter.