Loading...
HomeMy WebLinkAbout299834_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102114334 PROJECT ADDRESS: 316 E Beverly Pl PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/20/2023 INITIAL REVIEW 3/26/2023 EXPIRATION 9/16/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Amir Soumeeh 3. TEL: (949)294-3950 FAX: VALUATION: $38,000.00 EMAIL: FLOOD ZONE: Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. 5. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet A0.00 Provide the following design data on the first sheet (R106.1.1) ☐Sheet Index ☒Occupancy groups (R-3/U) ☒Type of construction (V-B) ☒Automatic Fire Sprinkler (YES or NO) ☐Number of stories. ☒Flood Zone: X ☐Flood Zone: A ☐Flood Zone: AE ☐Floor area per occupancy group, including the existing structure(s) ☐Construction shall comply with the 2022 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.Roof projections within 5’-0” from property line requires 1-hour fire rated underside or code approved equivalent. Specify on site plan where required and provide detail for proposed system. Sheet A0.02Verify Title 24 sheet provided for ADU. There is no ADU provided.Sheet A2.01Window in bathroom shall be noted to be tempered.Sheet A2.02Provide door schedule for new man door in garage.Verify if walls on plan west side are new or existing. Walls are not hatched as new.Please coordinate with structural sheets if there are new ceiling joists as shown in Section 4.Sheet A4.01Detail 2 – Provide new roofing information including class, ICC, etc…Detail 2 – Please coordinate with structural sheets if there are new ceiling joists.Detail 2 – Provide new garage finish information.Detail 2 – Verify insulation, provide insulation rating and information. Sheet S1Please coordinate with architectural sheets if there are new ceiling joists. Revise design as needed if occurs.Clarify new (2)T (2)K at postsProvide sheathing capacities for each individual types shown in schedule (nailing, staples, etc…)Sheet SD1Detail OE – Coordinate rafter projection with Architectural detail 2/A4.01. (End of Comment)