HomeMy WebLinkAbout296930_3_Corrections.docxSPC
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101113382
PROJECT ADDRESS:
662 E Dyer Rd
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B, S-1 (Change of occupancy from S-2)
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/4/2023
INITIAL REVIEW
1/30/2023
EXPIRATION
7/3/2023
RECHECKS:
1.3/8/2023
PROJECT APPLICANT CONTACT PERSON:
2.
Jasper Javier
3.
TEL:
(714)767-1804
FAX:
VALUATION:$88,680.00
EMAIL:
JJavier@CatalinaMH.com
FLOOD ZONE:X-0602320278J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714) 573-6100).
- Public Works Agency approval (647-5039).PLAN CHECK COMMENTS:Remove the tunnel rack type A1. The required egress path shall not pass through any storage racks or no racks are allowed above the required exit door landings. Revise plan.Provide all pages of structural calculation for type A, A1, B1 and C configuration of the proposed racks. Only complete calculation is provided for type B racks.2nd round of review comment: Not resolved. Calculation is not provided.On plan, show height of the horizontal braces and diagonal braces on all side elevations on all types of racks.Refer to sheet SED 1, provide Catalina material handling drawing and attach to the submittal package as part of the construction document.2nd round of review comment: Not resolved. Documentation is not available on plan.Sheet SED 1. Cross-reference all connection details (1 through 8) into the rack elevations on plan. Identify all applicable connection details for structural members, bracing members and column anchorage.Sheet SED 1. Detail 2. Design and specify on plan that the maximum vertical distance of the bolts at the column between the diagonal bracing and horizontal bracing on plan.2nd round of review comment: Not resolved. Details on sheet SED1 shows 8” distance. However, it does not match calculation which shows 3”. Plans and calculation shall be consistent.Please copy design data from structural calculation page 3 and incorporate into the drawings. E.g. sheet SED 1.2nd round of review comment: Not resolved. The information is not available on sheet SED1.END OF COMMENTS