Loading...
HomeMy WebLinkAbout296769_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 104113318 PROJECT ADDRESS: 1238 W First St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/28/2022 INITIAL REVIEW 1/27/2023 EXPIRATION 6/26/2023 RECHECKS: 1.4/6/2023 PROJECT APPLICANT CONTACT PERSON: 2. Cristina Ionescu 3. TEL: (714)267-8739 FAX: VALUATION: $150,000.00 EMAIL: socalpermitrunner@gmail.com FLOOD ZONE: X-0602320257J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Sheet A-2: Opening shall not be provided at the fire wall (between two buildings on two separate lots). Please infill opening with the required fire-rated wall assembly (math existing). 2nd Review Comment: Response was incomplete. Please revise proposed floor plan on sheet A-2 to show existing opening will be infilled. Also, provide a detail to show construction of infill concrete wall – show minimum rebar and dowel into the existing wall. Sheet A-3: Structural Review CommentsTrusses package shall be part of this submittal and cannot be deferred. Please omit/remove the Truss Deferral Notes. 2nd Review Comment: Truss calculation was provided – Please submit the truss calculation to the engineer of record (BCI Engineering) for review and approval. The engineer of record shall provide “review” stamp on the truss calculation pack for general conformance with the building design. (End of Comment)