HomeMy WebLinkAbout297476_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101113553 PROJECT ADDRESS: 1851 E First St Unit# 410 PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/19/2023 INITIAL REVIEW 2/3/2023 EXPIRATION 7/18/2023 RECHECKS: 1.3/11/23 PROJECT APPLICANT CONTACT PERSON: 2.4/8/23 Lizzy Cadwell 3. TEL: (949)724-1499 FAX: VALUATION: $128,000.00 EMAIL: lizzy@spaces-oc.com FLOOD ZONE: X-0602320277J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide the following:ok 3/11/23 - Provide a fully dimensioned site plan on each set of plans. The text fonts shall be large and legibleok 3/11/23Provide on the drawings a complete door schedule, showing: ( For relocated doors and break room door)ok 3/11/23 - Door sizes (CBC 11B-404) - Hardware complying with exiting and disabled accessibility requirements It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Ok 3/11/23Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 11B-202.4):ok 3/11/23 - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsComplete the attached Disabled Accessibility Documentation Form. Pending 3/11/23Ok 4/8/23Provide on the drawings a complete window schedule showing: ( For the conference room)ok OK3/11/23 - Window sizes - Type and thickness of glazing (type of safety glazing for hazardous locations noted under CBC Section 2406.3Provide elevation for conference room glazing.Pending 3/11/23 Provide engineering calculation for lateral and vertical for 15 ‘ opening , also provide calculation to justify 1 /2 “ thick glazing works for 11 feet glazing.Pending 4/8/23, a) Engineer of record shall sign the drawings and construction details per calculation. To include sheet # A5.1 Detail 7/A5.1, provide bracing on both direction of soffit.Detail 7/ A5.1, Provide gauge number and size for the bottom track .Show minimum 9” toe clearance at the partition wall to the floor for the accessible toilet compartment.Ok 3/11/23 Provide 36”x48” clear floor in front of urinal when the privacy wall is more than 24” deep.Ok 3/11/23Show 60” clear circle the breakroom.Ok 3/11/23On ceiling plan, please show If the ceiling is new or existing. Ok 3/11/234/8/23 On door schedule, show conference room door is tempered.Note on the job description “Creating unit 410 from unit 400.