Loading...
HomeMy WebLinkAbout290457_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101111326 PROJECT ADDRESS: 325 N Tustin Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: II B OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/25/2022 INITIAL REVIEW 8/4/2022 EXPIRATION 1/21/2023 RECHECKS: 1.4/19/2023 PROJECT APPLICANT CONTACT PERSON: 2. Joel Anderson 3. TEL: (714)850-7575 FAX: VALUATION: EMAIL: janderson@bundyfinkel.com FLOOD ZONE: X-0602320277J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.2nd Review Comment: Sheet A0.1, Sheet Index – Plans listed under the Fuel Dispensers are not part of building plan review, please note “FOR REFERENCE ONLY” on the plan. Please provide structural calculation and details for the dispensers support and anchorage. 2nd Review Comment: Structural calculation was provided but structural plan and detail was not provided. Please provide structural plan and details for the dispensers support and anchorage. Reminder:Calculation and structural plans shall be stamped, signed, and dated by a California registered civil engineer. Two sets of structural calculations are required.(End of Comment)