Loading...
HomeMy WebLinkAbout300818_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101114631 PROJECT ADDRESS: 5 E Hutton Center Dr Unit# 1100 PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/12/2023 INITIAL REVIEW 5/22/2023 EXPIRATION 10/9/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Claudia Lai 3. TEL: (949)608-3716 FAX: VALUATION: $49,500.00 EMAIL: clai@saaia.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit (2)corrected sets of plans.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)PLAN CHECK COMMENTSSheet A-0.1. Scope of work. Add the following to the scope: “Consolidate the floor under Unit #1100. Unit #1110, #1120 and #1130 will be deactivated.”Sheet A-0.1. Sheet A-0.5C. Complete exit analysis, occupant load calculation and exit width calculation tables on plan.Provide egress analysis and egress plan for the entire floor. Sheet A-0.5C. Portion of the occupiable spaces are reduced to one means of egress by the newly added doors blocking the egress route through reception area. Review and revise design to provide (2) means of egress are required to each exit stairway. (1006, Table 1006.2.1)Sheet A-0.5C. While doors with keycard serving egress routes leading to two separate exit stairways on both direction, demonstrate how doors with keycards are openable from both sides during emergency.Sheet A-0.5C. Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”Sheet A-0.5C. Exit doors shall swing in the direction of exit travel when serving any hazardous area or when serving an occupant load of 50 or more.Sheet A-0.5C. The exits or exit-access doors shall be placed a distance apart of at least one-third the maximum overall diagonal of area served, measured in a straight line between the doors. Dimension the distance between the exits or exit-access doors.Sheet A-0.5C. Tactile exit signs shall be required at the following locations on plan. A tactile exit sign with the words “EXIT ROUTE” shall identify each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign.Sheet A-0.5C. Note on plans: “Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.”Sheet A-0.5C. Note on the plans: “Exit signs shall be internally or externally illuminated at all times. Externally illuminated exit signs shall be connected to an emergency power system (batteries, unit equipment or an on-site generator) that will automatically illuminate the exit signs for a duration of not less than 90 minutes in case of primary power loss.”Sheet A-0.5C. Note the following on the plans: “The means of egress, including the exit discharge, will be illuminated to a level of not less than one foot-candle at the walking surface at all times the building space served by the means of egress is occupied”.Sheet A-2.0. Provide partition wall (type G1) assembly details on plan and make cross-reference to the partition table. Detail 2/A-30.4 is not available.Provide a cross section for the glass partition at type G1 detailing the support of the top of the partition to the roof or floor above and to the floor below.Sheet A-30.4A. According to plan, the structural engineer’s license has been expired. Please renew the license and provide valid expiration date on plan.END OF COMMENTS