HomeMy WebLinkAbout300932_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101114679
PROJECT ADDRESS:
310 E Goetz Ave
PLAN CHECK ENGINEER:
Huang, GaryTEL:714
647-5862
EMAIL:
Ghuang@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/13/2023
INITIAL REVIEW
5/8/2023
EXPIRATION
10/10/2023
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Xavier Contreras
3.
TEL:
(562)639-9757
FAX:
VALUATION: $55,000.00
EMAIL:
xavi@sadlersolar.com
FLOOD ZONE: X-0602320278J
GUIDELINES:
Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies
This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES)
The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws
All listed plan review comments must be adequately addressed before a building permit can be issued
Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.
PLAN REVIEW COMMENTS:
Applicant shall address all the checked‘☒’ correction comments below before resubmitting plans to Building Safety for recheck.
☒1. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☐Police Department approval on the corrected/final set of drawings (647-5840).
☒Public Works Agency approval (647-5039).
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Sheet T-1: California registered Civil Engineer shall sing/stamp drawings pertain to (N) Photovoltaic System installation, i.e. sheet T-1, PV1 to PV3, and manufacture drawings/calculation (total of 10 sheets)Sheet PV-2Solar layout shall match layout provided by manufacture design per page 7 by Ecolibrium Solar, or revise calculation to match layout shown on sheet PV-2 Numbers of block shown on sheet PV-2 shall be equal or more than calculation provided. EOR to verify prior to resubmitClearly identify number of blocks on drawing per calculation, the drawing print out is not legibleSheet PV-3: provide legible drawing for review. Further review is requiredSheet 7 of Ecolibrium Solar drawing: number of blocks and layout shall match calculation and plan. See comment 3 above. (End of Comment)