PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101113509
PROJECT ADDRESS:
1821 E Newport Cir
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B
OCCUPANCY CLASSIFICATION(S):
B, F-1, M
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/17/2023
INITIAL REVIEW
1/19/2023
EXPIRATION
7/16/2023
RECHECKS:
1.4/22/2023
PROJECT APPLICANT CONTACT PERSON:
2.
Scott Davis
3.
TEL:
(951)217-9624
FAX:
VALUATION:$25,850.00
EMAIL:
scott@correctcryogenics.com
FLOOD ZONE:X-0602320277J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSThis review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714) 573-6100).
- Public Works Agency approval (647-5039).PLAN CHECK COMMENTSSheet S1 through S3. The structural anchorage and foundation is designed by a licensed structural engineer. All structural sheets and supporting documents shall be prepared, stamped and signed by a California licensed structural engineer of record. CBC Sections A106.1 and A106.3.4.1.Sheet S1.Revise the site plan to show the proposed CO2 tank model and location on the site plan. It is missing on the revised site plan.Remove all cross-reference (bubbles) on the site plan to A sheets. Those details are not part of this review. END OF COMMENTS