Loading...
HomeMy WebLinkAbout297332_3_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101113509 PROJECT ADDRESS: 1821 E Newport Cir PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): B, F-1, M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/17/2023 INITIAL REVIEW 1/19/2023 EXPIRATION 7/16/2023 RECHECKS: 1.4/22/2023 PROJECT APPLICANT CONTACT PERSON: 2. Scott Davis 3. TEL: (951)217-9624 FAX: VALUATION:$25,850.00 EMAIL: scott@correctcryogenics.com FLOOD ZONE:X-0602320277J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSThis review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714) 573-6100). - Public Works Agency approval (647-5039).PLAN CHECK COMMENTSSheet S1 through S3. The structural anchorage and foundation is designed by a licensed structural engineer. All structural sheets and supporting documents shall be prepared, stamped and signed by a California licensed structural engineer of record. CBC Sections A106.1 and A106.3.4.1.Sheet S1.Revise the site plan to show the proposed CO2 tank model and location on the site plan. It is missing on the revised site plan.Remove all cross-reference (bubbles) on the site plan to A sheets. Those details are not part of this review. END OF COMMENTS