Loading...
HomeMy WebLinkAbout298377_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101113860 PROJECT ADDRESS: 640 E Dyer Rd PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/21/2023 INITIAL REVIEW 3/4/2023 EXPIRATION 8/20/2023 RECHECKS: 1.4/29/23 PROJECT APPLICANT CONTACT PERSON: 2. Frank Lin 3. TEL: (312)404-8932 FAX: VALUATION: $950,000.00 EMAIL: permit-app@osdesignconsulting.com FLOOD ZONE: X-0602320278J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Reminder:Please submit architectural plans to the OCFA for review and approval. Plans shall include summary of storing materials for manufacturing and lab use. Final plans shall be stamped and signed by the licensed architect of record.Sheet T-1.0: Scope work: The mezzanine is no longer complying with the mezzanine provision – Please revise scope of work to specify “convert of existing mezzanine to a second floor office”. Contact Planning Division for approval of the second floor conversion. 2nd Review Comment: Plan has not revised. Please comply with the comment above. Sheet A-2.0: Reminder: Plans shall be legible. 2nd Review Comment: For clarity, please show dimension for the restroom hallway. Second Floor Restrooms shall be made accessible. Please provide restroom plans to show restrooms complying with 11B, Division 6. 2nd Review Comment: For clarity, please cross-reference to Sheet ADA-1.2 for enlarged 2nd floor restroom plans. Sheet A-5.0: Mechanical plans are under a separate review. Hence, structural plans and calculation for the proposed roof top units shall be submitted with the building set for building plan review and approval. Please provide structural calculation, roof framing plan and details for the roof top support and anchorage. 2nd Review Comment: Sheet SD-1 – Please specify “special inspection is required for field welding”. Sheet AD-1.0 & AD-2.0:On the plan, please specify manufacturer’s name and ICC report number for the suspended ceiling system. 2nd Review Comment: Response was incomplete. Please provide/show manufacture’s name and ICC report number for the suspended ceiling system.