Loading...
HomeMy WebLinkAbout292916_2_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112069 PROJECT ADDRESS: 2350 S Redhill Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I B, SPK OCCUPANCY CLASSIFICATION(S): A-3, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/20/2022 INITIAL REVIEW 9/27/2022 EXPIRATION 3/19/2023 RECHECKS: 1.5/16/2023 PROJECT APPLICANT CONTACT PERSON: 2. Lisa Zoscak 3. TEL: (949)338-4189 FAX: VALUATION:$200,000.00 EMAIL: lisa@aquatictechnologies.com FLOOD ZONE:X-0602320279J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039). - County of Orange Health Department approval on the corrected/final set of drawings ((714) 433-6000).Sheet SP-001. Add note to the scope of work: amenities shown on the landscape in pool area are not part of this permit.Sheet SP-001. The pool enclosure is part of the swimming pool requirements that shall be part of this review. Provide structural plans, details and calculations for the pool enclosure walls and gates.2nd review cycle plan check response: The pool area approved in the building permits (101107195-96) is for general egress design. The design for the pool, spa, and pool enclosures are not part of the previous approval.The pool enclosure is associated with the pool design and shall be part of the scope this review. Provide structural plans, details and calculations for the pool enclosure walls and gates.Sheet SP-001. Add to the scope of work that pool enclosure is part of this permit.Sheet SP-001. Revise sheet index to include all landscape sheets which related to pool enclosure only. Sheet SP-001. Add note to sheet index that LC.1 sheet is fore reference only.On the attached landscape sheets, cross-out all other details that are not part of this review. Show details only related to pool enclosure.Please add page number in the structural calculation.Revise detail C/LC.5 to provide 42” minimum height guardrail instead of 2’-6”.All following structural design, plans and details shall be prepared, stamped, signed and dated by a licensed design professional.Detail A/LC.4.Detail B/LC.4.Detail C/LC.4.Detail C/LC.5.Detail A/CL.8.2nd review cycle plan check response: The pool area approved in the building permits (101107195-96) is for general egress design. The design for the pool, spa, and pool enclosures are not part of the approval. E.g. 14/GS8.2.All items. Please provide calculation to justify structural design on each detail. Before submitting, please make sure all structural connection is covered. Some structural details still refer to the landscape design without further connection design to the slab.Detail B/LC.4. The structural detail on 20/GS8.1 for wall attachment to slab design does not match detail B/LC.4. Please review and revise.Missing structural calculation and detail on item #e. Do not refer design to other plan check set. All design must be on this plan.END OF COMMENTSNo additional comments on the drawings.No additional comments on structural calculations.