Loading...
HomeMy WebLinkAbout295192_4_Corrections.docxPLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112789 PROJECT ADDRESS: 2320 S Redhill Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III-B, SPK OCCUPANCY CLASSIFICATION(S): A-2, B, M, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/23/2022 Plans changed on the 4th submittal (5/11/23) INITIAL REVIEW 11/26/2022 EXPIRATION 5/22/2023 RECHECKS: 1.2/3/2023 PROJECT APPLICANT CONTACT PERSON: 2.2/11/2023 Heidi Hare 3.5/21/2023 TEL: (949)246-0492 FAX: VALUATION: $4,159,863.00 EMAIL: heidi@jlhare.com FLOOD ZONE: X-0602320279J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout.[5/11/23] Plans were changed on the 4th submittal (architectural and structural changes – delta 4). The following comments are required and remain applicable. Additional plan check may be required for the changes and plan comments are not resolved. Picking up old plans are required – Please pick up all the resubmitted plans.Sheet T1.0: On the plan, please specify Prefabricated Trusses will be a deferred submittal. Sheet AS1.0: The distances measured between the two buildings (the existing apartment building and new building E), at units 5 & 6 – The distances were slightly off. Please revise plan to show distances measured from face of wall to face of wall (edge of columns). Maintain 20-ft separation for unlimited opening. Sheet A 2.0, Egress plan was changed: Enclosed patios – Patio with more than 49 occupant loads shall be provided with minimum two (2) exit doorways. Exits shall be unobstructed and continued to the public way. Patio exit doors shall be designed/sized with the accumulated occupant loads from the inside of the building plus the patio. Structural Sheet S1.1: grid line A – Please specify footing schedule for footing along grid line A (between lines 1-5); and at shear wall MW1. Sheet S2.1: grid line A, Detail 211/S5.1 & 217/S5.2 – Provide structural calculation for collector (strut) connection of wood beam to CMU wall. The connection shall be designed for the tension and compression seismic force of 20,247-lb per calculated seismic force on page L4. Provide detail to show weather and fire-rated protection for the proposed engineered wood beam. Coordinate with the architect and clearly cross-reference detail onto the plan. Reminder: Please submit foundation plan and details to the geotechnical engineer for review and approval. The geotechnical engineer shall “review” stamp the plans for conformance with the soil report recommendation. Reminder – resubmit letter for final approval. (End of Comment)