Loading...
HomeMy WebLinkAbout300545_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101114552 PROJECT ADDRESS: 1401 N Tustin Ave Unit# 150 PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/5/2023 INITIAL REVIEW 5/9/2023 EXPIRATION 10/2/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Vanessa McKenna 3. TEL: (949)388-9484 FAX: VALUATION: $11,722.00 EMAIL: polarbearair777@yahoo.com FLOOD ZONE: X-0602320164J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSAll items noted on this plan-check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit two corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment. GENERAL REQUIREMENTS Clearances - Please obtain approval from the following agencies prior to permit issuance: Planning Division – The plans approved by the Building Division must include the Planning approval stamp. Building staff will notify the Planning Division for approval. For approval status, contact the Planning Division at (714) 647-5804 or visit the Planning Division counters. Plan Check Expiration – This plan check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the extension request is approved, all plan checks will expire after 360 days from the submittal date. No further extension will be granted after 360 days from the submittal date. MEP Reviews – This review does not include Mechanical, Electrical, and Plumbing (MEP). Additional plan check fee will be required after the third review on hourly basis. INSTRUCTIONS: Plan Check Comments Instructions - Review all corrections and provide a written response. Redline Pickups Instructions - The drawings markups (Redlines) are available to pick up at the Building Division counters by walk-ins. Appointments are not required. Our business hour is Monday through Thursday and alternative Fridays from 8:00 am to 3:00 pm. See the Holiday and Closed Friday Schedule before you plan your visit. Resubmittal Instructions – Provide a written response to the Plan Check Comments. Provide two copies of the latest construction document (drawings, calculations, and others related document). Provide one additional copy of drawings for new constructions or additions. Resubmit all construction document with one of the three options below: Resubmittal Bin:Complete the Plan Check Re-Submittal Form along with the resubmittal. The resubmittal bin is available at the City Hall Ross Annex lobby, Monday through Thursday and alternating Fridays from 8:00 am – 4:00pm. See the Holiday and Closed Friday Schedule before you plan your visit. Walk-ins: Daily walk-ins are available for resubmittals at first come first serve basis. Please note all scheduled appointments will be served first prior to any walk-ins. Appointment: Call the Building division at 714-647-5800 to schedule a resubmittal appointment, or contact your assigned permit counter staff for your specific project. PLAN REVIEW COMMENTS: TITLE SHEET Provide the business name of the tenant. (OC UrgentCare Medical Group Inc.) Revise the scope of work as follow:” Install two suspended air handlers.” Revise the Sheet Index. This plan review does not include Mechanical, Electrical, and Plumbing (MEP) work. Delete all MEP sheets under sheet index or reference MEP sheets under separate permits. Provide the following building code information: Occupancy Classification: Types of Construction: Fire Sprinkler: Yes or No? Floor Area: Number of Stories: Total Occupant Load: Indicate on plan the applicable current codes: 2022 California Building Code (CBC) 2022 California Building Energy Efficiency Standards (CBEES) 2022 California Green Building Standards Code (CalGreen) City of Santa Ana Municipal Code The site plan references sheet A2.1 and A2.2 for existing and new floor plan. However, sheet A2.1 and A2.2 are missing. Sheet SK-1 Rotate the notes on the framing plan, so that it is not upside down. Sheet SK-2 & SK-3 Rotate details 90-degree clockwise. [The End]