HomeMy WebLinkAbout298377_3_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101113860
PROJECT ADDRESS:
640 E Dyer Rd
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
2/21/2023
INITIAL REVIEW
3/4/2023
EXPIRATION
8/20/2023
RECHECKS:
1.4/29/23
PROJECT APPLICANT CONTACT PERSON:
2.5/23/23
Frank Lin
3.
TEL:
(312)404-8932
FAX:
VALUATION: $950,000.00
EMAIL:
permit-app@osdesignconsulting.com
FLOOD ZONE: X-0602320278J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)Reminder:Please submit architectural plans to the OCFA for review and approval. Plans shall include summary of storing materials for manufacturing and lab use. Final plans shall be stamped and signed by the licensed architect of record. 3rd Review Comment: Plan sheet A-1.0, A-2.0, A-2.1, A-3, and AD-1.0 were not stamped and signed by the architect of record. Please review and provide stamp and signature on all plan sheets. 3rd Review Comment: Two sets of stamped and signed structural calculations are required for final review and approval.