Loading...
HomeMy WebLinkAbout292631_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102111979 PROJECT ADDRESS: 1625 E St Gertrude Pl PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): M, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/12/2022 INITIAL REVIEW 11/4/2022 EXPIRATION 3/11/2023 RECHECKS: 1.3/29/23 PROJECT APPLICANT CONTACT PERSON: 2. Robby Pinnamaneni 3. TEL: (602)312-5232 FAX: VALUATION: $20,000.00 EMAIL: robbyp@ease.com FLOOD ZONE: X-0602320276J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceShow bathrooms comply with accessibility.Pending 3/29/23 Provide 48” clearance at the front of the toilets and 60 “ from the toilet wall to the sink. Provide 60” clear landing at the bathroom door.CBC Section 1022.2.2, Exterior exit doors shall lead directly to the exit discharge or the public way.Ok 3/29/23CBC Section 1028.5. Access to a public way. The exit discharge shall provide a direct and unobstructed access to a public way. Ok 3/29/23 Provide a man door at the existing fence in the back.Ok 3/29/23Exit illumination and exit sign requirements in accordance with CBC Section 1013 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.Ok 3/29/23Complete the attached Disabled Accessibility Documentation Form. Pending 3/29/23Not clear what exactly proposing . Provide calculation and construction detail for the free standing wall to resist lateral load.Pending 3/29/23 , On the drawings please show the wall is being removed Show height of the full height wall on detail 2/A1.0.Ok 3/29/23 3/29/23Not clear are bathroom walls new ? , show demo walls and new walls.Provide spacing for the wood studs on detail 1/A1.0.Please identify MSB on sheet A2.0. Provide minimum 48 “ clearancebetween bathroom doors and lobby door and loading area door. ( Doors in series)Show “ No Parking “ at the space next to exit door from the loading/ Unloading area.Provide truncated dome at the exit door.