PLAN CHECK NO:
102113297
PROJECT ADDRESS:
1216 W Second St Unit# 2
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/27/2022
INITIAL REVIEW
1/26/2023
EXPIRATION
6/25/2023
RECHECKS:
1.6/12/2023
PROJECT APPLICANT CONTACT PERSON:
2.
Thomas R Antal
3.
TEL:
(714)402-8115
FAX:
VALUATION: $15,000.00
EMAIL:
tomantal49@gmail.com
FLOOD ZONE: X-0602320257J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2022California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
6. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY):
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☒Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☒Police Department approval on the corrected/final set of drawings (647-5840).
☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. These may be picked up at Building and Planning department at applicants’ discretion.Documentation
Energy Conservation – Title 24 Energy forms & calculationsProvide documentation to demonstrate compliance with the California Energy Code. Climate zone 8 is used.Compliance forms with signatures must be provided on plans.Kitchen shall be vented to the outside. On the plan, please show exhaust fan(s) in kitchen (100 cfm minimum).Provide building sections to show building envelope, including wall, floor, and roof/ceiling insulation, per Title 24 calculation. On the plan, please specify U-factor (0.3 min) and SHGC (0.23 min) for building fenestration, per Title 24 calculation. Photovoltaic system is required for all newly constructed low-rise SFD including detached ADU, and Multifamily buildings. On the plan, please specify minimum system size (in KW) in accordance with the Title 24 calculation. (Section 150.1(c)14; 150.1(b)(1))
CalGreen Plan Review Comments:
Plumbing fixtures flow rate limitation
Water closet – 1.28 gallon per flush
Shower head – 1.8 gallons per minute at 80 psi.
Lavatory faucets – 1.2 gallon per minute at 60 psi.
Kitchen faucet – 1.8 gallon per minute at 60 psi.
Structural Plan Review Comments:Show braced walls in compliance with Section R602.10; otherwise, engineer design is required.Final plans and calculations are to be stamped, signed and dated by a California licensed architect or California registered civil engineer.Provide on the plans, structural material notes (ex. Lumber species & grade, glu-lam beams, concrete (fc’ = ___ psi (min)), steel reinforcement, special inspection requirements, etc.))Provide roof and floor sheathing specification. Footing shall be embedded minimum 18” below the finish grade with two (2) #4 reinforcing bars at top and bottom (total 4 re-bars). Concrete slab: Minimum 4” thick, reinforced with #4 bars at 18” on center, each way. Concrete slab shall be provided with moisture barrier. DrawingsProvide a project description with a complete and detailed scope of work on the cover sheet of the plans.Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation.Provide the following design data on the first sheet (R106.1.1)
☒Sheet Index
☒Occupancy groups (R-3/U)
☒Type of construction (V-B)
☒Automatic Fire Sprinkler (YES or NO)
☒Number of stories.
☒Flood Zone: X
☐Flood Zone: A
☐Flood Zone: AE
☐Floor area per occupancy group, including the existing structure(s)
☒Construction shall comply with the 2019 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.Add note on the coversheet: Photovoltaic system will be submitted under a separate permit and shall be issued prior to building frame inspection request.Provide a complete plot plan showing – (R106.2)
☐Location and size of all structures on the lot.
☐Identify all property lines and easements, streets, etc.
☒Show north arrow and scale.
☐Distances between buildings (main house, detached garage, accessory dwelling unit, etc.).
☐Distances (setbacks) between buildings and property lines.Grading exemption list shall be provided in drawing set on full size sheets. Exterior walls without Automatic Residential Fire Sprinkler – (Table R302.1(1))
Eaves projection – Provide one-hour protection on the underside of eave when eaves projected into the 5-ft of fire separation distance. No projection beyond 2-ft of the fire separation distance. Clearly specify on plans and provide details for proposed system.Clearly indicate on floor plan the location of existing walls, new walls, and walls to be removed. Please provide Wall Legend.Every dwelling unit shall be provided with heating facilities capable of maintaining a room temperature of not less than 68°F (20°C) at a point 3 feet (914 mm) above the floor and 2 feet from exterior walls in habitable rooms at the design temperature. The installation of one or more portable space heaters shall not be used to achieve compliance with this section. (R303.9)
Show/provide safety glass in hazardous locations (R308) –
☒Glazing in doors – all fixed and operable panels of swinging, sliding and bifold doors.
☐Glazing with exposed area more than 9 sq. ft with bottom edge is located less than 18” above the walking surface and top edge is located more than 36” above the floor.Smoke Alarms – Provide smoke alarm(s) in each sleeping room; in each area giving access into each sleeping room; in basement and habitable attics. (R314)PC #2: Provide smoke alarm in bedroom on Sheet PEM 1.Carbon Monoxide Alarms – Provide carbon monoxide alarms at outside of each sleeping area, in the immediate vicinity of the bedroom(s); on every level of a dwelling unit including basements. (R315) Detail corrosion–resistant weep screed minimum of 4” above the earth or 2” above paved areas. (R703.7.2.1)Veneer –
On the plan, please specify manufacturer’s name, and ICC report number of the veneer.
Provide detail attachment of veneer.
Attic access and Ventilations –
☒Show location(s) of 22" x 30" attic access with 30" minimum clear headroom. (R807.1) PC #2: Specify attic access dimensions on plan on sheet FP 1
☒Show on the plans - attic vent locations, type and size (area = 1/150 of the attic space). Provide an attic cross ventilation summary; on the plans indicate the total area required versus provided. (R806.1)
☒For an FAU located in the attic, provide a minimum access of 22 x 30 inches, a 24-inch wide walkway, a 30-inch deep work platform, and electric light outlet adjacent to the furnace and switched by the opening. (CMC 904.11 & 305)
Roofing requirements – (R902.1)
☒A Class “C” roof is required. On the plan, specify manufacturer’s name, ICC/UL report number and Class for the roofing material.
☒Specify the pitch of the roof plan. Provide two layer of vapor barrier if roof slope is lower than 4:12.
☒Cool roof is required. On the plan, specify CRRC #. Additional Comments
Sheet Cover
Governing Code shall be revised to 2019 CBC as project was submitted in 2019 CBC code cycle.
Unpermitted detached shed shall be demo’ed per discussion. Scope of work shall be revised to note demo unpermitted 400sf detached shed.
SP 2
Unpermitted detached shed shall be shown to be demo’ed.
FP 1
Roof projection along West and South side shall be noted to be fire rated. Reference fire rated detail on PEM 1 on plans.
Window Type 1 adjacent to entrance door shall be tempered. Note on plans and ensure window is tempered prior to final inspection.
S-1.0
Provide information for existing unpermitted slab on grade including thickness, reinforcing, weather proofing, etc… Unpermitted items shall not be listed as existing.
Provide calculations for assumed existing foundation size, else strengthen as needed.
Provide detail for interior foundation and post installed connection to slab on grade.
Justify interior non-bearing wall between bedroom and dining room. Roof framing shows ceiling joist bearing atop wall. Provide calculations justifying wall connection to slab on grade or provide new interior foundation and details for bearing wall.
S-2.0
Verify detail reference 6B/SD2 along Grid 2. Detail not provided.
Provide details for non-bearing wall top connections. Ensure no bearing occurs via slip clips and gap.
Provide detail for ceiling joist splice over wall and ceiling beam.
SD-2
Detail 3 – Specify nailing at ceiling joist to roof rafter in detail. Nailing shall be designed to take truss action into consideration if designing as ridge board. Else, design ridge beam and supports.
Calculations
2x4 RR – Justify beam span used in RR design. Design specifies 5’-0” span each side. (End of Comment)