Loading...
HomeMy WebLinkAbout292911_3_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112066 PROJECT ADDRESS: 2010 E Warner Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I B, SPK OCCUPANCY CLASSIFICATION(S): A-3, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/20/2022 INITIAL REVIEW 9/27/2022 EXPIRATION 3/19/2023 RECHECKS: 1.5/15/2023 PROJECT APPLICANT CONTACT PERSON: 2.6/6/2023 Lisa Zoscak 3. TEL: (949)338-4189 FAX: VALUATION:$150,000.00 EMAIL: lisa@aquatictechnologies.com FLOOD ZONE:X-0602320279J APPLICABLE CODE: 2019 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039). - County of Orange Health Department approval on the corrected/final set of drawings ((714) 433-6000).PLAN CHECK COMMENTSRevise plan to clarify and make pool enclosure design consistent:The pool enclosure information was submitted on the previous submittal, but they are missing in the submitted plans. Per landscape plan (sheet LC.1), please provide referenced pool enclosure details.At the boundaries of the pool area, the plot plan (sheet SP-101) shows cable guardrails, but on the landscape plan (sheet LC.1) and enclosure design package (sheet A1 and A2) showing glass walls. The height of the glass wall in detail B/LC.12 is also not consistent with the elevation B1/A2.END OF COMMENTSNo additional comments on the drawings.No additional comments on structural calculations.