Loading...
HomeMy WebLinkAbout302799_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102115301 PROJECT ADDRESS: 2203 S Orange Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/2/2023 INITIAL REVIEW 7/18/2023 EXPIRATION 11/29/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Gonzalo Guillen 3. TEL: (714)227-1189 FAX: VALUATION: $75,000.00 EMAIL: gplanos@sbcglobal.net FLOOD ZONE: X-0602320278J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). Sheet A-1: Scope of work item #2 – Please revise item #2 to specify create of new Den/Office. Sheet A-2: Please revise plan to remove wall, door and closet as for Den/Office room. Sheet A-5: Please revise utility plan to match with the revised floor plan. Sheet A-3: Engineering is required for the removal/alteration of the interior bearing wall. Please provide structural calculation for the structural ceiling beams/headers. Plans and calculation shall be stamped, signed and dated by a California licensed civil engineer. Sheet A-3: Please provide construction detail for new walls. Show wall attachment at top and bottom. (End of Comment)