Loading...
HomeMy WebLinkAbout293984_3_Corrections.docxPLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101112399 PROJECT ADDRESS: 1951 E Dyer Rd PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/18/2022 INITIAL REVIEW 10/23/2022 EXPIRATION 4/16/2023 RECHECKS: 1.2/1/23 PROJECT APPLICANT CONTACT PERSON: 2. Diana Matheson 3. TEL: (619)929-5742 FAX: VALUATION: $25,000.00 EMAIL: dmatheson@allresco.com FLOOD ZONE: X-0602320278J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2019 California Building Code (CBC); CMC = 2019 California Mechanical Code; CPC = 2019 California Plumbing Code; CEC = 2019 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. All plan sheets must be the same size sheets. Please resubmit plan with same paper size. Please clearly show location of sculptures. Provide pedestrian protection if the sculptures locate on the pedestrian area and/or pedestrian route. 2nd Review Comment: The original permit application specified two (2) sculptures – Please confirm that the scope of work has been changed to one (1) sculpture as shown on the plan. Provide structural calculation and details for the sculptures’ support (foundation and anchor). 2nd Review Comment: Sheet A-002 and SL.1 – Detail 6/SL.1: Please specify slab thickness (t) and minimum reinforcement for slab supporting the proposed sculpture. Provide structural detail for anchorage of sculpture pedestal to the concrete slab (match structural calculation). (End of Comment)