HomeMy WebLinkAbout303151_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101115414 PROJECT ADDRESS: 1041 S Dennis St Unit# 2 PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/12/2023 INITIAL REVIEW 7/25/2023 EXPIRATION 12/9/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Troung Dong 3. TEL: (714)617-5979105 FAX: VALUATION: $60,000.00 EMAIL: info@dongengineering.com FLOOD ZONE: X-0602320256J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. Plans shall be signed and dated by the person who’s responsible for designing the project. Sheet A0: Applicable Codes: Please revise applicable codes to the 2022 code edition. Solar photovoltaic notes: Photovoltaic system is not required for the new addition. Please coordinate and revise note accordingly. Building Tabulations: Please revise to show existing (E) ADU and show new JADU. Site plan: Please provide additional information for the surface drainage. Show minimum slope and away from the building wall and drain to the street. Drainage should not be drained to the adjacent properties. Sheet A1: Please provide additional information for the surface drainage. Show minimum slope and away from the building wall and drain to the street. Drainage should not be drained to the adjacent properties. Sheet A2 & A3: Please update CalGreen Notes to reflect and reference to the current code (2022 Cal Green Building Code). Sheet A3: Exterior wall located less than 5-ft from the property line shall be protected with one-hour fire-rated wall assembly. Please show on plan one-hour wall and provide construction wall assembly. Wall located less than 5-ft from the property line shall be limited to 25% wall opening. Please provide wall opening calculation. Opening shall meet light, ventilation and emergency escape for the bedroom. Specify tempered glass for glazing in sliding door and windows adjacent to the bathtub, including the one next to the toilet. Sheet A4: Roofing material – Please specify roofing material. Building Section B: For clarity, please revise arrow for the attic insulation pointing to the correct location. Please clearly show where building sections were cut through. Sheet AD1: Details shall be clearly cross-referenced onto the plan and delete/omit detail that does not apply to the project. Sheet T24.1 & T24.2: Please use 2022 Certificate compliance forms. Use the software version for the 2022 code edition. Sheet S.0: Please update notes and code reference to reflect with the 2022 CBC and Design Standards. (End of comment)