Loading...
HomeMy WebLinkAbout302746_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101115280 PROJECT ADDRESS: 3220 W Pendleton Ave PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/15/2023 INITIAL REVIEW 6/19/2023 EXPIRATION 12/12/2023 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Erica Hsu 3. TEL: FAX: VALUATION: $50,000.00 EMAIL: erica.mng.licensing@gmail.com FLOOD ZONE: X-0602320258J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSAll items noted on this plan-check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit two corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment. GENERAL REQUIREMENTS Clearances - Obtain any applicable approval from the following agencies prior to permit issuance: Planning Division – The plans approved by the Building Division must include the Planning approval stamp. Building staff will notify the Planning Division for approval. For approval status, contact the Planning Division at (714) 647-5804 or visit the Planning Division counters. Public Works Agency (PWA) – Obtain PWA clearance if any of the following applies: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation). After the Building Division approves your project, visit the Building Division counters and request a copy of the approved plan. Bring the approved plan to the PWA counters for approval. After PWA approves your project, return the approved plan to the Building Division counters. Police Department (PD) – The plans approved by the Building Division must include the PD approval stamp. After the Building Division approves your project, Building staff will notify PD for approval. For approval status, contact the PD at (714) 647-5840 or email PolicePlanCheck@santa-ana.org. Orange County Fire Authority (OCFA) - Submit plans to OCFA immediately if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria. Bring an OCFA approved plan to the Building Division counters for permit issuance. Contact OCFA for approval status. County of Orange, Health Care Agency, Environmental Health (OC Health) – Submit plans to OC Health if the business involves food service. Contact OC Health for submittal requirements. If OC Health approval is required, bring an OC Health approved plan to the Building Division counters for permit issuance. School District – After the Building Division approves your project, Building staff will send a School Fee Form to your school district if school fee applies to your project. Applicant shall pay the school fee and bring the signed Certificate of Compliance form to the Building Division counters for permit issuance. Cal/OSHA – Check the Cal/OSHA permit requirements here. Plan Check Expiration – This plan check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the extension request is approved, all plan checks will expire after 360 days from the submittal date. No further extension will be granted after 360 days from the submittal date. MEP Reviews – This review does not include Mechanical, Electrical, and Plumbing (MEP). Additional plan check fee will be required after the third review on hourly basis. INSTRUCTIONS: Plan Check Comments Instructions - Review all corrections and provide a written response. Redline Pickups Instructions - The drawings markups (Redlines) are available to pick up at the Building Division counters by walk-ins. Appointments are not required. Our business hour is Monday through Thursday and alternative Fridays from 8:00 am to 3:00 pm. See the Holiday and Closed Friday Schedule before you plan your visit. Resubmittal Instructions – Provide a written response to the Plan Check Comments. Provide two copies of the latest construction document (drawings, calculations, and others related document). Provide one additional copy of drawings for new constructions or additions. Resubmit all construction document with one of the three options below: Resubmittal Bin:Complete the Plan Check Re-Submittal Form along with the resubmittal. The resubmittal bin is available at the City Hall Ross Annex lobby, Monday through Thursday and alternating Fridays from 8:00 am – 4:00pm. See the Holiday and Closed Friday Schedule before you plan your visit. Walk-ins: Daily walk-ins are available for resubmittals at first come first serve basis. Please note all scheduled appointments will be served first prior to any walk-ins. Appointment: Call the Building division at 714-647-5800 to schedule a resubmittal appointment, or contact your assigned permit counter staff for your specific project. PLAN REVIEW COMMENTS: TITLE SHEET Provide the name of the business tenant. On the title block, the wording “MNG Enterprise” is replaced with the wording “Social Market Inc.” with a pen. Revise the wording on CAD(Computer-aided drafting). Correct this item on every sheet. This plan review does not include Mechanical, Electrical, and Plumbing (MEP) work. Delete all MEP sheets under sheet index or reference MEP sheets under separate permits. Remove all mechanical sheets and electrical sheets. Under Scope of Work, specify the quantity of OCF units, MAU units, and one RTU. Under Project Summary, revise the occupancy groupsfrom “S-2/B” to “S-1/B”. S-2 occupancy group typically stores non-combustible material. Cannabis is a combustible material and should be classified as “S-1”. Provide the following notes under Separate Permit: Fire sprinkler drawings shall be submitted and approved by the Orange County Fire Authority (OCFA) prior to the final of the building permit.Sheet A201Floor plan shows distribution #2. Where is distribution #1?The egress path of 133 feet is shown. This distance is technically a common path of egress travel distance (CPETD) as defined in 2022 California Building Code. The definition of CPETD is the following: “That portion of exit access travel distance measured from the most remote point of each room, area or space to that point where the occupants have separate and distinct access to two exits or exit access doorways.” Per Table 1006.2.1, the maximum CPETD on a S-2 occupancy shall not exceed 100 feet. It appears the design egress path is overestimated where the path travels extra distance in the distribution room. Reduce this distance or provide a second exit.Specify the fire rating of the demising wall. The required fire rating of the demising wall is depended on the occupancy group of the adjacent tenant. See Table 508.4 for detail.Sheet A204Provide structural detailing information on the screen wall.[The End of Comments]